首页 | 官方网站   微博 | 高级检索  
     

鄂尔多斯盆地长7储层致密油水平井CO2补充能量与吞吐参数优化
引用本文:郭肖,刘瑞璇,高振东,王玥,王鹏鲲.鄂尔多斯盆地长7储层致密油水平井CO2补充能量与吞吐参数优化[J].科学技术与工程,2023,23(3):1033-1041.
作者姓名:郭肖  刘瑞璇  高振东  王玥  王鹏鲲
作者单位:西南石油大学;延长油田股份有限公司
基金项目:国家科技重大专项(2016ZX05042-003,2016ZX05065-003); 延长油田股份有限公司项目(ycsy2020ky-A-01-04);陕西延长石油(集团)有限责任公司研究院项目(YJKFS21sfw0008)
摘    要:长7储层是鄂尔多斯盆地主要的致密区块,近一半的致密油分布其中。针对长7储层开采渗透率低、开采难度大、依靠弹性开采产能较低、能量衰竭较快等问题,通过数值模拟的方法,构建水平井分段压裂数值模拟模型,首先对比不同吞吐方式对油田产能的影响,优选出CO2吞吐为首选的补充能量方式。其次对井网形式、井网参数及吞吐参数进行优化研究。最终优选出合适的吞吐方案,达到提高生产效率的目的。结果表明,该储层的最优注采吞吐参数为:周期注入量为2 673 t、注入压力为21 MPa、注入速度为90 t/d、焖井时间为10 d。研究对鄂尔多斯盆地长7储层提高采收率具有一定的参考意义。

关 键 词:致密油藏  CO2吞吐  水平井  补充能量
收稿时间:2022/5/23 0:00:00
修稿时间:2022/10/29 0:00:00

Optimization of CO2 Replenishment Energy and Huff and Puff Parameters for Tight Oil Horizontal Wells in Chang 7 Reservoir, Ordos Basin
Guo Xiao,Liu Ruixuan,Gao Zhendong,Wang Yue,Wang Pengkun.Optimization of CO2 Replenishment Energy and Huff and Puff Parameters for Tight Oil Horizontal Wells in Chang 7 Reservoir, Ordos Basin[J].Science Technology and Engineering,2023,23(3):1033-1041.
Authors:Guo Xiao  Liu Ruixuan  Gao Zhendong  Wang Yue  Wang Pengkun
Affiliation:Southwest Petroleum University
Abstract:Chang 7 reservoir is the main tight block in Ordos basin, where nearly half of the tight oil is distributed. Aiming at the problems of low permeability, difficult mining, low production capacity relying on elastic mining and fast energy depletion in Chang 7 reservoir. The numerical simulation model of horizontal well staged fracturing is constructed by numerical simulation. Firstly, the influence of different huff-and-puff methods on oilfield productivity is compared, and CO2 huff-and-puff is selected as the preferred energy supplement method. Secondly, the well pattern, well pattern parameters and throughput parameters are optimized. Finally, the appropriate throughput scheme is selected to improve production efficiency. The results show that the optimal injection-production huff and puff parameters of the reservoir are: cyclic injection volume is 2673t, injection pressure is 21MPa, injection rate is 90t/d, and soaking time is 10d. The study has certain reference significance for improving the recovery rate of Chang 7 reservoir in Ordos Basin.
Keywords:Tight reservoir  CO2 huff and puff  horizontal wells  supplement energy
点击此处可从《科学技术与工程》浏览原始摘要信息
点击此处可从《科学技术与工程》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号