首页 | 官方网站   微博 | 高级检索  
     

特高含水期多层合采油藏油井液量调配优化方法
引用本文:王瑞.特高含水期多层合采油藏油井液量调配优化方法[J].科学技术与工程,2021,21(10):3986-3991.
作者姓名:王瑞
作者单位:中石化胜利油田分公司勘探开发研究院,东营257000
基金项目:国家自然科学基金(51974343)、国家科技重大专项(2016ZX05011-002-003)
摘    要:水驱油藏进入特高含水期,井网相对固定,受储层非均质性的影响,油井含水差异大,油井液量调配是改善油井开发效果差异的经济有效的主要措施.为建立油井液量调配的优化方法,以多层合采油藏中一注多采井组为例,考虑特高含水期储层物性参数和剩余油分布的非均质特征,将一注多采井组等效为多个一注一采井组;综合考虑渗透率和原油黏度的时变特征以及注水启动压力,建立了一注一采多层合采剖面模型开发指标的计算方法,以油井液量调配后各油井含水率趋于一致为目标,采用迭代法计算得到油井调配所需液量.经过数值模拟验证表明,采用建立的油井液量调配优化方法得到的液量进行生产,在给定的调配时间内油井能够达到相近的含水率,有效改善了水驱开发效果.

关 键 词:特高含水期  多层合采  渗流模型  等效井组  液量调配
收稿时间:2020/3/18 0:00:00
修稿时间:2020/12/31 0:00:00

Optimization Method of Oil Well Fluid Allocation in Multi-layer Commingled Production Reservoir at Ultra-high Water Cut Stag
Wang Rui.Optimization Method of Oil Well Fluid Allocation in Multi-layer Commingled Production Reservoir at Ultra-high Water Cut Stag[J].Science Technology and Engineering,2021,21(10):3986-3991.
Authors:Wang Rui
Affiliation:Exploration and Development Research Institute of Shengli Oilfield,SINOPEC
Abstract:With the water drive reservoir entering the ultra-high water cut stage, the well pattern is relatively fixed. Affected by reservoir heterogeneity, water cut in oil wells varies greatly. Oil well fluid allocation is a main economic and effective measure to improve the difference of oil well development effect. In this paper, the optimization method of oil well fluid allocation is established by taking one injection multi production well group in multi-layer combined production reservoir as an example. Considering the time-varying characteristics of permeability and crude oil viscosity as well as the starting pressure of water injection, a profile model of one injection and one production is established to calculate the development index. By equating one injection and multiple production well group to multiple one injection and one production well groups, aiming at the same water cut after the oil well fluid volume is allocated, the required fluid volume for oil well allocation is obtained by iterative method. The results of numerical simulation show that the water cut of the oil wells in a given time is similar, and the effect of water flooding development is effectively improved.
Keywords:Ultra high water cut stage      Multi-layer combined production      Flowing model      Equivalent well group      Liquid volume allocation
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《科学技术与工程》浏览原始摘要信息
点击此处可从《科学技术与工程》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号