盾构机平移过站施工技术
引用本文:刘晓珍.盾构机平移过站施工技术[J].山西建筑,2014(9):110-111.
作者姓名:刘晓珍
作者单位:中铁二十三局集团轨道交通工程有限公司,上海201300
摘    要:针对地铁盾构中盾构机需要穿越车站,而有些车站因交通疏解导致不能预留吊装口的现状,介绍了盾构机平移过站原理,分析了盾构机平移过站施工技术,指出盾构机平移过站施工技术具有广泛推广应用的价值。

关 键 词:地铁盾构  盾构过站  施工技术

Construction technique of station-crossing movement on shield tunnel construction
LIU Xiao-zhen.Construction technique of station-crossing movement on shield tunnel construction[J].Shanxi Architecture,2014(9):110-111.
Authors:LIU Xiao-zhen
Affiliation:LIU Xiao-zhen ( China Railway 23rd Bureau Group Rail Transit Engineering Co. ,Ltd, Shanghai 201300, China)
Abstract:According to shield machine through station in railway shield, in light of some stations can' t be reserved for the hoisting orifice due to traffic, the paper introduces the principle of station-crossing movement for shield machine, analyzes its construction technique, and finally points out its application in subway shield tunnel engineering.
Keywords:subway shield tunnel  station-crossing movement  construction technique