首页 | 官方网站   微博 | 高级检索  
     

安装刮吸泥机前后污水沉降罐受力分析
引用本文:张艳,李自力,李扬,马宁.安装刮吸泥机前后污水沉降罐受力分析[J].化工机械,2008,35(3):148-151.
作者姓名:张艳  李自力  李扬  马宁
摘    要:针对污水沉降罐在安装刮吸泥机后的受力可靠性问题,建立了简化力学模型和三维弹塑性有限元模型。利用ANSYS软件计算了沉降罐在改建前、假设只有刮吸泥机载荷作用和改建后3种受力状态下的等效应力和位移的分布,以及滚轮位于导轨不同位置时整个装置的受力情况。结果表明,导轨和支撑肋板承担大部分的刮吸泥机载荷。

关 键 词:污水沉降罐  刮吸泥机  载荷  有限元

Stress Analysis of the Sewage Settling Tanks Before and After Installing a Scraping and Sucking Sludge Machine
ZHANG Yan,LI Zili,LI Yang,MA Ning.Stress Analysis of the Sewage Settling Tanks Before and After Installing a Scraping and Sucking Sludge Machine[J].Chemical Engineering & Machinery,2008,35(3):148-151.
Authors:ZHANG Yan  LI Zili  LI Yang  MA Ning
Abstract:A simplified mechanical model and a 3-dimensional elastic-plastic finite element model was founded for the stress reliability of the sewage settling tanks before and after installing a scraping and sucking sludge machine.The equivalent stress and displacement distribution of the sewage settling tanks were calculated under three stress conditions(before and after installing a scraping and sucking sludge machine,and letting it be supposed that there was only the load action of the scraping and sucking sludge machine),and the stress condition of the whole apparatus was also calculated when the roller wheels were in different locations of the guide track using ANSYS software.The result shows that the guide track and the support ribbed plates bear most parts of the load of the scraping and sucking sludge machine.
Keywords:Sewage Settling Tank  Scraping and Sucking Sludge Machine  Load  Finite Element
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号