首页 | 官方网站   微博 | 高级检索  
     

二炼钢3号连铸机移位改造项目大包回转台施工
引用本文:许明星.二炼钢3号连铸机移位改造项目大包回转台施工[J].山西建筑,2009,35(21):140-141.
作者姓名:许明星
作者单位:福建省三明市三钢建筑工程有限公司,福建三明,365000
摘    要:针对三钢二炼钢3号连铸机大包回转台基础施工过程中出现的问题,通过对两种常规方案进行可行性分析,大胆创新,提出采用新旧桩结合的新方案,经过实施收到了良好效果,从而为今后类似改造工程提供了一种成功案例。

关 键 词:爆扩桩  放坡式  钢桶沉降式  人工挖孔桩

Ladle turret construction of the shift transformation project of the third caster in the second steelmaking
XU Ming-xing.Ladle turret construction of the shift transformation project of the third caster in the second steelmaking[J].Shanxi Architecture,2009,35(21):140-141.
Authors:XU Ming-xing
Affiliation:XU Ming-xing
Abstract:Aiming at the problems accounted in the foundation construction process of the shift transformation project of the third easter in the San' gang second steelmaking, the author gets feasibility analysis on two regular schemes, innovates boldly, provides the new scheme of combining with the new and old pile, based on the complementation gets good effect, thus providing a new successful case for the similar transformation project.
Keywords:explosive-enlarged pile  step-slope style  steel barrel settlement style  artificial excavation pile
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号