首页 | 官方网站   微博 | 高级检索  
     

平凉110 kV电网无功电压问题分析及解决方案
引用本文:郑晶晶,王维洲,杨 勇.平凉110 kV电网无功电压问题分析及解决方案[J].电网与水力发电进展,2010,26(7):48-52.
作者姓名:郑晶晶  王维洲  杨 勇
作者单位:甘肃电力科学研究院,兰州,730050 
摘    要:平凉电网的无功、电压存在的问题主要是华亭电网的无功潮流分布不合理和电压偏高问题,为了切实有效解决电压问题,查找原因,根据平凉电网4种典型方式,进行无功优化计算,分析平凉电网无功负荷分布情况和无功补偿情况,降低华亭电网110kV系统电压是此无功电压解决方案。

关 键 词:无功潮流  优化计算  电压偏高

Analysis on the Reactive Voltage of Pingliang 110 kV Power Grid and olutions
Authors:ZHENG Jing-jing  WANG Wei-zhou and YANG Yong
Affiliation:Gansu Electric Power Research Institute, Lanzhou 730050, Gansu Province, China;Gansu Electric Power Research Institute, Lanzhou 730050, Gansu Province, China;Gansu Electric Power Research Institute, Lanzhou 730050, Gansu Province, China
Abstract:Existence of reactive power in the Pingliang power grid can be attributed to the unreasonable distribution of reactive power tides and higher voltage existing in the Huating power network. To find out the causes and to address the problem effectively, the reactive power optimization computation is done according to the four typical modes of the Pingliang power grid, analyses are done for the distribution and compensation of the reactive power in the grid. It is concluded that lowering the system voltage of the 110 kV Huating network be the right solution to solve the reactive power issue.
Keywords:reactive power  optimization calculation  higher voltage
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《电网与水力发电进展》浏览原始摘要信息
点击此处可从《电网与水力发电进展》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号