首页 | 官方网站   微博 | 高级检索  
     

工程项目总监理工程师素质的模糊综合评价方法
引用本文:海山,申立银.工程项目总监理工程师素质的模糊综合评价方法[J].土木建筑与环境工程,1999,21(3):100-105.
作者姓名:海山  申立银
作者单位:深圳市南山区建设工程质量监督站(海山),香港理工大学建筑及房地产学系(申立银),重庆建筑大学管理工程学院(任宏)
摘    要:我国建设监理自1988年试行以来对工程建设的全过程,特别是对工程项目实施过程中项目三大目标(质量、投资、过度)在很大程度上起到了控制作用,大大改变了过去的“工期马拉松、投资无底洞、质量难保证”的局面。建设监理这项高智能的技术服务活动的效果好坏与总监理工程师负责制下工程项目总监理工程师的素质紧密相关。本文分析了项目总监理工程师素质应当具备的基本要素,用模糊数学方法建立了评价项目总监理工程师素质的模型,为业主选定监理单位时评价项目总监理工程师人选提供了可行的方法。

关 键 词:建设监理  工程项目  总监理工程师(文中简称总监)  素质  模糊数学  模型  评价

Fuzzy Analysis Method for Evaluating the Qualityof Project General Supervision Engineer
HAI Shan,SHEN Li_yin,REN Hong.Fuzzy Analysis Method for Evaluating the Qualityof Project General Supervision Engineer[J].土木建筑与环境工程,1999,21(3):100-105.
Authors:HAI Shan  SHEN Li_yin  REN Hong
Abstract:Since the implementation of the new construction system in 1988 in China, this system has gone through three phases: trial phase(1988-1993),development phase(1993-1995),and comprehensive application phase from 1996.Construction supervision as a new management system has profound effects to the whole process of a construction project, in particular, to the three conventional objectives, that is quality, cost and construction time. The new management system has to a large extent brought the traditional problems of extended construction time, uncontrollable cost and unsecured quality to a normal practice. Construction supervision is a management activity with request of high intelligence. The performance of this activity is closely related to the quality of project general supervision engineer. This paper identifies the basic elements that a proper project general supervision must have. By applying the fuzzy analysis principle, this paper presents a quantitative model for evaluating the quality of project general supervision engineer.It provides an applicable approach for project clients when general supervision engineers are to be chosen.
Keywords:construction supervision  construction project  general supervision engineer  personal quality  fuzzy mathematics  model evaluation
点击此处可从《土木建筑与环境工程》浏览原始摘要信息
点击此处可从《土木建筑与环境工程》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号