首页 | 官方网站   微博 | 高级检索  
     

MIKE21水动力学模型在洪泽湖水位模拟中的应用
引用本文:梁云,殷峻暹,祝雪萍,黄晓敏.MIKE21水动力学模型在洪泽湖水位模拟中的应用[J].水电能源科学,2013,31(1):135-137,99.
作者姓名:梁云  殷峻暹  祝雪萍  黄晓敏
作者单位:东华大学 环境工程与科学学院, 上海 201620; 2. 中国水利水电科学研究院 水资源研究所, 北京 100038;中国水利水电科学研究院 水资源研究所, 北京 100038;中国水利水电科学研究院 水资源研究所, 北京 100038; 大连理工大学 建设工程学部水利学院, 辽宁 大连 116024;东华大学 环境工程与科学学院, 上海 201620; 2. 中国水利水电科学研究院 水资源研究所, 北京 100038
基金项目:国家科技重大专项课题基金资助项目(2012ZX07205005);北京市科技计划课题基金资助项目(Z111100074511005)
摘    要:洪泽湖作为淮河流域最大的平原水库和南水北调东线工程的重要调蓄水库,确保其优良的水质和稳定的水位至关重要。根据洪泽湖的地形和水文条件,利用MIKE21水动力学模型,模拟了洪泽湖的水位变化过程。结果表明,MIKE21模型能较好地模拟洪泽湖水位过程,模拟误差均在可接受范围内,且模拟精度可满足计算要求。

关 键 词:MIKE21水动力学模型  南水北调东线工程  模拟水位  洪泽湖

Application of MIKE21 Hydrodynamic Model in Water Level Simulation of Hongze Lake
LIANG Yun,YIN Junxian,ZHU Xueping and HUANG Xiaomin.Application of MIKE21 Hydrodynamic Model in Water Level Simulation of Hongze Lake[J].International Journal Hydroelectric Energy,2013,31(1):135-137,99.
Authors:LIANG Yun  YIN Junxian  ZHU Xueping and HUANG Xiaomin
Affiliation:School of Environmental Science and Engineering, Donghua University, Shanghai 201620, China; Department of Water Resources., China Institute of Water Resources and Hydropower Research, Beijing 100038, China;Department of Water Resources., China Institute of Water Resources and Hydropower Research, Beijing 100038, China;Department of Water Resources., China Institute of Water Resources and Hydropower Research, Beijing 100038, China; School of Hydraulic Engineering, Faculty of Infrastructure Engineering, Dalian University of Technology, Dalian 116024, China;School of Environmental Science and Engineering, Donghua University, Shanghai 201620, China; Department of Water Resources., China Institute of Water Resources and Hydropower Research, Beijing 100038, China
Abstract:To ensure fine water quality and stable water level of Hongze Lake, which is the largest plain reservoir of the Huaihe River Basin and important storage reservoir of east route of south to north water transfer project, it is very important. Based on the terrain and hydrological conditions of Hongze Lake, MIKE21 hydrodynamic simulation model is used to simulate the water level change process of Hongze Lake. The results show that MIKE21 model can excellently fulfill the goal, and the simulation errors are within acceptable limits and the simulation accuracy can meet the calculation requirement.
Keywords:MIKE21 hydrodynamic model  east route of south to north water transfer project  simulated water level  Hongze Lake
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号