广蓄电站尾水支管渐变段钢衬失稳原因分析与处理措施
引用本文:孙鲁豫.广蓄电站尾水支管渐变段钢衬失稳原因分析与处理措施[J].水力发电,1996(10).
作者姓名:孙鲁豫
作者单位:广东抽水蓄能电站联营公司
摘    要:广蓄电站一期工程尾水隧洞在充水时,4条尾水支管渐变段钢衬都发生了不同程度的失稳变形,特此对尾水支管渐变段钢衬失稳的原因及工程处理措施、钢衬修复、加固、焊接和美国TUL防水涂料的施工工艺作简单介绍,以供设计、施工人员从中吸取教训。

关 键 词:广蓄电站,尾水支管,钢衬,失稳处理

Analysis on the steel liner off-stability in the transition section of the draft-tube branch of Guangzhou Pumped-storage Power Plant and their treatment measures
Sun Luyu.Analysis on the steel liner off-stability in the transition section of the draft-tube branch of Guangzhou Pumped-storage Power Plant and their treatment measures[J].Water Power,1996(10).
Authors:Sun Luyu
Affiliation:Guangdong Pumped-storage Power Plant Joint Operation Company
Abstract:When the tailrace tunnel of Guangdong Pumped-storage Power Plant in the first phrase was filled by water,the off-stability deformations of the steel liner in the transition section have occurred in the four draft-tube branchesto different degree. This paper describes briefly the off-stability causes of the steel liner in the transition section of the draft-tube branches and their treatment measures, the steel liner repairment, reinforcement and welding, and the construction techniques of the TUL waterproof paint made in USA, which could provide the lessons for the design and construction of new projects.
Keywords:Guangdong Pumped-storage Power Plant  draft-tube branch  steel liner  off-stablilty treatment