首页 | 官方网站   微博 | 高级检索  
     

基于载荷试验的青藏铁路试验路堤沉降监测设备可靠性验证
引用本文:胡明鉴,汪稔,黄明奎,于基宁,付伟.基于载荷试验的青藏铁路试验路堤沉降监测设备可靠性验证[J].岩土力学,2006,27(7):1209-1213.
作者姓名:胡明鉴  汪稔  黄明奎  于基宁  付伟
作者单位:中国科学院岩土力学重点试验室,武汉,430071
基金项目:中国科学院方向性项目;中国科学院武汉岩土力学研究所资助项目;中国科学院科研项目
摘    要:青藏铁路成败的关键在路基工程,而路基工程的关键是冻土问题.为研究填土分选重组试验路堤的承载力状况以及冻土沉降钻孔监测设备的性能和监测结果的可靠性,进行了基于平板载荷试验的冻土沉降监测设备可靠性验证,估算试验路堤的承载力.试验结果表明,将试验路堤土体视为各向同性弹性连续介质模型是合理的;冻土变形监测设备测试结果与利用土介质的各向同性弹性连续介质模型的计算结果相吻合,显示出冻土钻孔变形监测设备具有较高的可靠性.

关 键 词:青藏铁路  载荷试验  沉降监测  可靠性验证
文章编号:1000-7598-(2006)07-1209-05
收稿时间:2004-10-13
修稿时间:2005-03-05

Reliability verification of settlement monitoring instrument for Qinghai-Tibet Railway embankment based on plate loading test
HU Ming-jian,WANG Ren,HUANG Ming-kui,YU Ji-ning,FU Wei.Reliability verification of settlement monitoring instrument for Qinghai-Tibet Railway embankment based on plate loading test[J].Rock and Soil Mechanics,2006,27(7):1209-1213.
Authors:HU Ming-jian  WANG Ren  HUANG Ming-kui  YU Ji-ning  FU Wei
Affiliation:Key Laboratory of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430071, China
Abstract:Long-term researches have now indicated that the roadbed project is one of the key factors of the Qinghai-Tibet Railway which have close relationship with whether the project successful or not; frozen soils are the key problem of the roadbed project in cold regions. In order to protect the permafrost under the railway roadbed, prevent the inhomogeneous deformations induced by frost heaving and thaw collapsing of the frozen soils under the roadbed, we carried out the embankment filling grading and reconstructing local experiment research, embedded the frozen soil settlement drill monitoring instrument. We have accomplished the plate loading test to study the bearing capacity of the grading and reconstructing local experiment roadbed and the reliability of the inbuilt settlement monitoring instrument. Results show that it is reasonable to regard the soil of the experiment as isotropic, continuum and elastic substance. Based on this mothod, the calculated settlement of the experiment roadbed is in accord with the monitoring result, high quality and reliability of the settlement drill monitoring instrument had now been testified.
Keywords:Qinghai-Tibet Railway  plate loading test  settlement monitoring  reliability verification
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号