首页 | 官方网站   微博 | 高级检索  
     

丁集矿副井井架基础沉降变形分析
引用本文:王帅.丁集矿副井井架基础沉降变形分析[J].煤炭技术,2008,27(5):119-120.
作者姓名:王帅
作者单位:淮沪煤电有限公司,丁集煤矿,安徽,淮南,232141
摘    要:按井筒冻结施工的进度,选择合适的周期进行沉降变形观测,根据大量的实测资料对冻结施工前后丁集矿副井井架基础的沉降变形规律进行了分析,并预测其沉降变形趋势。

关 键 词:冻结施工  沉降变形  曲线图
文章编号:1008-8725(2008)05-0119-02
修稿时间:2008年1月6日

Analysis of Headframe Settlement Deformation Rules of Auxiliary Shaft of Dingji Coal Mine
WANG Shuai.Analysis of Headframe Settlement Deformation Rules of Auxiliary Shaft of Dingji Coal Mine[J].Coal Technology,2008,27(5):119-120.
Authors:WANG Shuai
Abstract:According to the progress of the shaft freezing construction,observed settlement deformation by choosing suitable cycles,and based on a lot of measured data,made an analysis of settlement deformation rules before and after freezing construction of the auxiliary shaft headframe of Dingji Coal Mine,then forecasted the trend of settlement deformation.
Keywords:freezing construction  settlement deformation  curve diagram
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号