首页 | 官方网站   微博 | 高级检索  
     


Correlation of tunnel convergence with TBM operational parameters and chip size in the Ghomroud tunnel, Iran
Authors:Ebrahim Farrokh  Jamal Rostami  
Affiliation:aSahel Consulting Co., Tehran, Iran;bDepartment of Energy and Mineral Engineering, Pennsylvania State University, University Park, PA, USA
Abstract:Evaluating the impact of rock mass properties on a tunneling operation is crucial, especially when using a tunnel boring machine (TBM). It is an integral part of machine selection and performance prediction in the design and bidding stage. Monitoring and analysis of ground conditions during the construction is also essential to allow the operator to take precautionary measures in adverse geological conditions. This involves adjusting TBM operational parameters such as machine thrust and penetration to avoid potential problems caused by face collapse or excessive convergence and subsequent machine seizure that can cause long delays. Tunnel wall convergence is a function of rock mass characteristics, in situ stresses, size of excavation, and rate of penetration (ROP). It is one of the main factors in determining the use of shielded machines in deep rock tunnel projects. The case study of the Ghomroud water conveyance tunnel project, under construction by a double shield TBM, is used to examine the effect of rock mass parameters on tunnel convergence and hence on the need for over excavation and shield lubrication to avoid problems such as shield seizure. Results of a preliminary analysis of field observations show that the amount of the tunnel convergence can have a direct relationship with the percentage of powder and large rock fragments in the muck. In addition, tunnel convergence has shown a strong relationship with the TBM thrust/torque and rate of penetration (ROP). These relationships have been examined and the results of the analysis as well as the resulting formulas will be explained in this paper.
Keywords:Tunneling  Excavation  Tunnel boring machine  Double shield TBM  Rock mass characterization  Tunnel convergence
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号