首页 | 官方网站   微博 | 高级检索  
     


Impacts of wastewater sludge amendments in restoring nitrogen cycle in p-nitrophenol contaminated soil
Authors:F Olcay Topac Sagban
Affiliation:Department of Environmental Engineering, Uluda? University, G?rükle 16059, Bursa, Turkey. olcaytopac@uludag.edu.tr
Abstract:The possible impacts on nitrogen-cycle in a p-nitrophenol (PNP) polluted soil and the effectiveness of wastewater sludge amendments in restoring nitrification potential and urease activity were evaluated by an incubation study. The results indicated that PNP at 250 mg/kg soil inhibited urease activity, nitrification potential, arginine ammonification rate and heterotrophic bacteria counts to some extents.After exposure to PNP, the nitrification potential of the tested soil was dramatically reduced to zero over a period of 30 days. Based on the findings, nitrification potential was postulated as a simple biochemical indicator for PNP pollution in soils. Nitrogen-cycling processes in soils responded positively to the applications of wastewater sludges. A sludge application rate of 200 tons/ha was sufficient for successful biostimulation of these nitrogen processes. The microbial activities in sludge-amended, heavy PNP-polluted soils seemed to recover after 30-45 days, indicating the effectiveness of sludge as a useful soil amendment.
Keywords:p-nitrophenol  wastewater sludge  soil pollution  nitrogen-cycle  biostimulation
本文献已被 维普 万方数据 PubMed 等数据库收录!
点击此处可从《环境科学学报(英文版)》浏览原始摘要信息
点击此处可从《环境科学学报(英文版)》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号