首页 | 官方网站   微博 | 高级检索  
     

基于OPNET的广域测量系统仿真与通信延时性能分析
引用本文:潘天亮,蔡泽祥,席禹,龙翩翩,陈天.基于OPNET的广域测量系统仿真与通信延时性能分析[J].电力系统保护与控制,2017,45(17):51-57.
作者姓名:潘天亮  蔡泽祥  席禹  龙翩翩  陈天
作者单位:华南理工大学电力学院,广东 广州 510640,华南理工大学电力学院,广东 广州 510640,华南理工大学电力学院,广东 广州 510640,华南理工大学电力学院,广东 广州 510640,华南理工大学电力学院,广东 广州 510640
基金项目:国家自然科学基金项目(51577073);广东省自然科学基金(2016A030313476)
摘    要:广域测量系统对实时性要求严格,而通信延时是影响实时性的重要因素。通信延时作为广域测量系统延时的重要组成,带有不确定性,因此成为其通信性能研究的重点和难点。对广域测量系统的通信设备、通信业务和通信网络拓扑进行建模,并依此对电力系统稳态工况、故障工况和网络设备故障工况三类场景进行仿真。由此得到在不同工况下广域测量系统的通信延时大小,从而评估分析该系统的现状和瓶颈。为广域测量系统的研究分析提供了新方法,同时为其规划与建设提供了参考意见。

关 键 词:广域测量系统  通信延时  OPNET  性能仿真
收稿时间:2016/8/24 0:00:00
修稿时间:2016/11/28 0:00:00

Simulation of WAMS and performance analysis of communication delay based on OPNET
PAN Tianliang,CAI Zexiang,XI Yu,LONG Pianpian and CHEN Tian.Simulation of WAMS and performance analysis of communication delay based on OPNET[J].Power System Protection and Control,2017,45(17):51-57.
Authors:PAN Tianliang  CAI Zexiang  XI Yu  LONG Pianpian and CHEN Tian
Affiliation:School of Electric Power, South China University of Technology, Guangzhou 510640, China,School of Electric Power, South China University of Technology, Guangzhou 510640, China,School of Electric Power, South China University of Technology, Guangzhou 510640, China,School of Electric Power, South China University of Technology, Guangzhou 510640, China and School of Electric Power, South China University of Technology, Guangzhou 510640, China
Abstract:Wide area measurement system (WAMS) is strict with real-time performance, and communication delay has great impact on real-time performance. Communication delay is an important part of WAMS delay. Its indeterminacy makes it important and difficult to study communication performance of WAMS. This paper establishes models of communication equipment, communication services and communication network topology of WAMS. According to these models, this paper gives three types of scene simulation, including static operating condition of power system, fault operating condition of power system and fault operating condition of network equipment. From this, the paper gets communication delay of WAMS in different operating condition to evaluate and analyze the current situation and bottleneck of WAMS. All above not only provide new method to research and analyze WAMS, but offer reference opinion to planning and construction of WAMS. This work is supported by National Natural Science Foundation of China (No. 51577073) and Natural Science Foundation of Guangdong Province (No. 2016A030313476).
Keywords:wide area measurement system (WAMS)  communication delay  OPNET  performance simulation
点击此处可从《电力系统保护与控制》浏览原始摘要信息
点击此处可从《电力系统保护与控制》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号