水利工程建设质量多阶段风险评价研究
引用本文:黄黎明,朱军,张可.水利工程建设质量多阶段风险评价研究[J].水利水电技术,2017,48(9):117-125.
作者姓名:黄黎明  朱军  张可
作者单位:(1.浙江省水利水电工程质量与安全监督管理中心,浙江杭州310012;2.河海大学,江苏南京210098)
摘    要:为实现政府监管部门对水利工程建设质量事中事后的有效监管,首先,在梳理国内外水利工程质量风险评价相关研究、部分省份水利工程建设质量监督检查意见的基础上,分别归纳整理出水利工程在开工前、建设实施两个阶段的初始质量风险评价指标体系,并采用探索性因子分析方法对指标体系进行精简;其次,采用多层次灰色评估法和基于信息集结算子的AHP法构建水利工程质量风险评价模型,对水利工程开工前、建设实施两个阶段的风险进行评价,识别出重点监管项目和部位,提升政府水利工程监管的效率;最后,选取典型水利工程建设的项目案例进行分析。案例分析证明:本文构建的两阶段质量风险评价体系及方法具有合理性,可为质监部门明确水利项目监督管理重点提供相关建议。

关 键 词:水利工程建设  质量风险  群体决策AHP  灰色系统理论  
收稿时间:2017-06-19

Study on multi-stage risk assessment of construction quality of water conservancy project
HUANG Liming,ZHU Jun,ZHANG Ke.Study on multi-stage risk assessment of construction quality of water conservancy project[J].Water Resources and Hydropower Engineering,2017,48(9):117-125.
Authors:HUANG Liming  ZHU Jun  ZHANG Ke
Affiliation:(1.Supervision and Management Center of Zhejiang Water Conservancy and Hydropower Engineering Quality and Safety, Hangzhou310012, Zhejiang, China;2.Hohai University, Nanjing 210098, Jiangsu, China)
Abstract:In order to realize the effective in-event and after-event supervision from the relevant government supervision department on the construction quality of water conservancy project, the initial quality assessment index systems for both the stage before construction and the stage of implementation are respectively summarized herein at first on the basis of sorting out the relevant studies made on the risk assessment of construction quality of water conservancy project at home and abroad and the inspection opinions from the supervisions made on water conservancy project construction quality from several provinces, and then the index system is simplified with the method of exploratory factor analysis; secondarily, a water conservancy project construction quality risk assessment model is established based on the AHP method of information aggregation operator with the multi-hierarchical grey appraisal method, and then the risks of the stage before construction and the stage of construction of water conservancy project are assessed, so as to identify the key supervision items and locations for enhancing the efficiency of the government supervision on water conservancy project; finally, a typical case of water conservancy construction project is selected for analysis. The case analysis demonstrates that both the two-stage quality risk assessment system and the method proposed herein are reasonable, thus can provide the relevant suggestions for the related quality supervision department to determine the key points of the supervision on construction quality of water conservancy project.
Keywords:construction of water conservancy project  quality risk  AHP-group decision making  grey system theory  