摘    要:水下采油树的下放安装作业环境载荷非常复杂,下放作业窗口是我国南海水下采油树下放过程中亟待解决的关键问题.针对东方1-1气田73 m水下采油树钢丝缆绳下放安装方法,分析了水下采油树下放作业过程.利用OrcaFlex建立了工程船-钢丝缆绳-水下采油树系统的耦合模型,研究了不同浪高、流速、波浪方向角等关键因素对水下采油树安装...

关 键 词:水下采油树  OrcaFlex  钢丝绳法  下放安装  下放作业窗口

Based on OrcaFlex Subsea Tree Wire Rope Drop Operation Window Research
ZHANG Chong,MENG Wenbo,REN Guanlong,TANG Xiandi,ZHAO Suwen,GUAN Qingtao,ZHAO Weiqing,LI Xinyan.Based on OrcaFlex Subsea Tree Wire Rope Drop Operation Window Research[J].Oil Field Equipment,2022,0(1):20-28.
Authors:ZHANG Chong  MENG Wenbo  REN Guanlong  TANG Xiandi  ZHAO Suwen  GUAN Qingtao  ZHAO Weiqing  LI Xinyan
Affiliation:1. Zhanjiang Branch,CNOOC China Limited,Zhanjiang 524057, China; 2. Deepwater Drilling Technology Branch,CNOOC Energy Technology & Services Ltd.,Zhanjiang 524057,China
Abstract:The environment load for the installation of subsea trees is very complicated,and the window of the operation is a key issue that needs to be solved urgently in the process of Subsea trees in the South China Sea.Aiming at the installation method of 73 m subsea tree wire rope installation in Dongfang 1-1 gas field,the operation process of subsea tree dropping operation was analyzed,and the coupling model of engineering ship-wire rope subsea tree system was established using OrcaFlex,and the differences were studied.The influence of key factors such as wave height,flow velocity and wave direction angle on the force of the wire rope during the installation process of the subsea tree and the movement response of the tree were studied.The orthogonal test method was used to study the criticality ranking of each influencing factor,forming a subsea tree.The research results show that when the wave height is5.06 m,0 m]and the flow velocity is0 m/s,1.09 m/s]in a closed area(safe operation area),it is suitable for the decentralized installation work of subsea tree in Dongfang 1-1 gas field.The research results can provide certain guidelines for the installation process of the wire rope of the subsea trees.
Keywords:subsea tree  orcaflex  steel wire rope  installation  running window