首页 | 官方网站   微博 | 高级检索  
     

浪店水源泵站工程应用大型潜水轴流泵的可行性
引用本文:贾玉爱.浪店水源泵站工程应用大型潜水轴流泵的可行性[J].山西水利科技,1999(Z1).
作者姓名:贾玉爱
作者单位:水利部山西水利水电勘测设计研究院
摘    要:浪店水源工程位于黄河小北干流,该河段河势游荡不定,引水口位置难以确定,为了适应河势变化,提高取水保证率,取得长远较好的社会效益,拟采用可移动的大型潜水轴流泵。本文就该工程应用此泵的可行性作一分析。

关 键 词:水源工程  潜水轴流泵  含沙量  可行性

Feasibility of Using Large-typed Subaqueous Shaft Pump In Langdian Water Project
Jia Yuai.Feasibility of Using Large-typed Subaqueous Shaft Pump In Langdian Water Project[J].Shanxi Hydrotechnics,1999(Z1).
Authors:Jia Yuai
Abstract:In this paper,the advantages of large-typed subaqueous shaft pump are introduced,the writers hold that this kind of pump can be used in the pumping station of Langdian water project,however,some measures on sealing of shaft bearing,selection of material of overflowing parts,system protection,and prevention and clearing of silt should be taken in the view of actual situation of pumping station in Langdian water project.
Keywords:Feasibility  Water Project  Subaqueous Shaft Pump  Silt  
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号