首页 | 官方网站   微博 | 高级检索  
     

不同市场条件下金属露天矿分期方案动态优化
引用本文:高占雷.不同市场条件下金属露天矿分期方案动态优化[J].世界有色金属,2020(1):209-210.
作者姓名:高占雷
作者单位:中国黄金集团内蒙古矿业有限公司
摘    要:不同市场条件下金属露天矿分期方案动态优化有关于金属露天矿分期方案动态优化的整体方案的设计与实施,是结合采选联合优化的一部分内容,针对地下采选一体化实现的露天金属矿采选联合优化,露天金属矿采选联合优化也是与金属露天矿分期方案动态优化相关,对于采选联合优化的选矿过程都是存有金属露天矿分期方案动态优化的内容,这就需要施工人员和设计者在涉及到井下的内部转化以及其他金属露天矿分期方案动态优化部分的过程中能够对于一些采选联合优化的内涵做出详尽的了解和分析。比如地下采矿中通常采用一体化设计,但是这种设计的缺点就是难以进行露天金属矿采选联合优化,但是对于矿山开展的试验性研究工作还是有利的,能够实现按空间位置的一体化是采选联合优化的内涵及发展历程的关键。

关 键 词:不同  市场  条件  金属  露天矿  分期方案  动态优化

Dynamic optimization of stage plan of metal open pit under different market conditions
GAO Zhan-lei.Dynamic optimization of stage plan of metal open pit under different market conditions[J].World Nonferrous Metals,2020(1):209-210.
Authors:GAO Zhan-lei
Affiliation:(China Gold Inner Mongolia Mining Co.,Ltd,Manzhouli 021400,China)
Abstract:Under different market conditions,the dynamic optimization of the stage plan of the metal open-pit mine involves the design and implementation of the overall scheme of the dynamic optimization of the stage plan of the metal open-pit mine,which is a part of the combined optimization of mining and dressing,aiming at the combined optimization of the underground mining and dressing,The joint optimization of mining and beneficiation in open-pit metal mine is also related to the dynamic optimization of the stage plan of open-pit metal mine.For the beneficiation process of joint optimization of mining and beneficiation There is the content of dynamic optimization of stage scheme in openpit metal mine,which requires the construction personnel and designers to make a detailed understanding and analysis of the connotation of some mining and dressing joint optimization in the process of involving the internal transformation of underground and dynamic optimization of stage scheme in other open-pit metal mine.For example,the integrated design is usually adopted in underground mining,but the disadvantage of this design is that it is difficult to carry out the joint optimization of open-pit metal mining and beneficiation,but it is still beneficial for the experimental research work carried out in the mine,and it is the key to the connotation and development process of the joint optimization of mining and beneficiation to realize the integration according to the space position.
Keywords:different  market  condition  metal  open pit  stage plan  dynamic optimization
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号