首页 | 官方网站   微博 | 高级检索  
     


Influence of Power-to-Fuel Plant Flexibility Towards Power and Plant Utilization and Intermediate Hydrogen Buffer Size
Authors:Peter Pfeifer  Linus Biffar  Friedemann Timm  Tim Böltken
Affiliation:1. Karlsruhe Institute of Technology, Institute for Micro Process Engineering, Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen, Germany;2. INERATEC GmbH, Siemensallee 84, 76187 Karlsruhe, Germany
Abstract:Conversion of intermittent renewable energy into synthetic fuels and chemicals is required to secure long-distance transport and feedstock for chemical industry. Due to the fluctuating energy generation, process intensification and feed flexibility are essential. This contribution investigates the importance of feed flexibility on the buffer size with applying a 20:80 scenario of wind/solar energy generation. The degree of power and plant utilization are calculated. With the capability to accept a lower load bound of 17 % after only 10 min, a minimum tank capacity of only 1.3 h is calculated to avoid a fuel plant stop throughout a calendar year. Additional tank capacity for peak power compensation in the range of ~10 h is beneficial for the utilization degree of power and under the prerequisite of a load-flexible fuel plant.
Keywords:Fischer-Tropsch synthesis  Microchannel reactors  Plant flexibility  Power utilization  Renewable energy
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号