首页 | 官方网站   微博 | 高级检索  
     

D-InSAR技术在长白山天池火山形变 监测中的误差分析与应用
引用本文:韩宇飞,宋小刚,单新建,屈春燕,汪驰升,郭利民,张桂芳,刘云华.D-InSAR技术在长白山天池火山形变 监测中的误差分析与应用[J].地球物理学报,2010,53(7):1571-1579.
作者姓名:韩宇飞  宋小刚  单新建  屈春燕  汪驰升  郭利民  张桂芳  刘云华
作者单位:中国地震局地质研究所,地震动力学国家重点实验室,北京 100029
基金项目:国家自然科学基金,国家科技支撑计划,地震行业专项,中国地震局地质研究所基本科研业务费(DF-IGCEA-0607-1-19)项目共同资助 
摘    要:选取长白山天池火山区15景JERS-1 L波段SAR存档数据,利用二轨法进行SAR差分干涉处理.最终用4景JERS-1数据获取了覆盖相似时间段的3幅D-InSAR形变图,提取了研究区1994~1998年的地表形变场.研究表明:远离天池火山的平坦区域形变微弱;从天池火山的山脚向上到2000~2200 m高程处,表现为逐渐增强的隆升形变,最高形变速率达到LOS(视线向)5 mm/a.尽管没有同期地面实测资料验证,但研究结论与2002~2005年的一等水准测量结果及地震活动性具有定性的一致性;与Kim的同期InSAR研究具有定量的可比性.在时间上向前延伸了对长白山天池火山的形变监测时段,为研究长白山天池火山活动状态提供了更多的形变信息.

关 键 词:D-InSAR技术  JERS-1  误差分析  长白山天池火山  形变监测  
收稿时间:2010-03-04

Deformation monitoring of Changbaishan Tianchi volcano using D-InSAR technique and error analysis
HAN Yu-Fei,SONG Xiao-Gang,SHAN Xin-Jian,QU Chun-Yan,WANG Chi-Sheng,GUO Li-Min,ZHANG Gui-Fang,LIU Yun-Hua.Deformation monitoring of Changbaishan Tianchi volcano using D-InSAR technique and error analysis[J].Chinese Journal of Geophysics,2010,53(7):1571-1579.
Authors:HAN Yu-Fei  SONG Xiao-Gang  SHAN Xin-Jian  QU Chun-Yan  WANG Chi-Sheng  GUO Li-Min  ZHANG Gui-Fang  LIU Yun-Hua
Affiliation:State Key Laboratory of Earthquake Dynamics, Institute of Geology, China Earthquake Administration, Beijing 100029, China
Abstract:In this study we applied two-pass D-InSAR technique to process 15 JERS-1 SAR data. The final deformation field of Changbaishan Tianchi volcano from 1994 to 1998 was expressed in 3 displacement maps which were obtained from 4 JERS-1 SAR data. The stuty achieves the following: firstly, the flat region far away from the summit of Changbaishan Tianchi volcano shows no obvious deformation; secondly, there is an increasing upward deformation from the foot of the mountain up to the areas at the elevation about 2000~2200 m, and the maximum uplift rate is 5 mm/a. Although the estimated inflation rate is not confirmed due to the lack of field work data, the results accord with the leveling studies from 2002 to 2005 and the seismic activity between 1994 and 1998. In addition, the largest deformation rate of 5mm/a is close to the result of Kim's study who also applied InSAR technique using several SAR data acquired in the same period. This study extends the deformation monitoring period of Changbaishan Tianchi volcano for several years, and provides more displacement information for future studies.
Keywords:JERS-1
本文献已被 万方数据 等数据库收录!
点击此处可从《地球物理学报》浏览原始摘要信息
点击此处可从《地球物理学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号