榆林能源化工基地建设引黄(河)方案设想 |
| |
引用本文: | 杨绍华.榆林能源化工基地建设引黄(河)方案设想[J].电网与水力发电进展,2004,20(3):38-41. |
| |
作者姓名: | 杨绍华 |
| |
作者单位: | 杨绍华(水利部陕西水利电力勘测设计研究院,陕西,西安,710001) |
| |
摘 要: | 榆林能源化工基地矿产资源丰富,水资源却极其贫乏,开发潜力已非常有限.由于该区距黄河较近,根据黄河干流现有水源工程和规划工程布局,可从黄河干流天桥、碛口、大柳树枢纽引黄河水.
|
关 键 词: | 榆林能源基地 缺水 引黄(河) |
文章编号: | 1671-4768(2004)03-0038-04 |
修稿时间: | 2004年3月5日 |
The tentative plan of water diversion from the Yellow River to supply Yulin Energy and Chemical Base |
| |
Authors: | Yang Shao-hua |
| |
Abstract: | Yulin region is rich in mineral products but poor in water resources with little develop potential. Considering the region is near to the Yellow River, a tentative plan is formulated according to water source works existed and the layout of scheme. The plan concerns water diversion from mainstream of the Yellow River at Tianqiao, Jikou and Daliushu projects. |
| |
Keywords: | Yulin energy and chemical base water shortage water diversion from the Yellow River |