Life-cycle assessment and repair of the railway transition zones of an existing bridge using geocomposite materials
Authors:Karmen Fifer Bizjak  Friderik Knez  Stanislav Lenart  Katja Slanc
Affiliation:1. Slovenian Building and Civil Engineering Institute – ZAG , Geotechnics &2. Traffic Infrastructure Department, Dimi?eva 12, Ljubljana, Slovenia;3. Slovenian Building and Civil Engineering Institute – ZAG , Department of Building Physics, Dimi?eva 12, Ljubljana, Slovenia
Abstract:The railway infrastructure is a very important component of the world’s total transportation network. Investment in its construction and maintenance is therefore significant on a global scale. Up to now, some results of the life-cycle assessment (LCA) of open railway line, as well as railway bridges and tunnels, have been published, but detailed analyses of transition zones have not so far been performed. In railway networks, transitional zones are a critical area where the transition from open rail to solid bridge construction can cause significant settlements. The goal of these analyses was to compare two different types of track renewal methods for railway transition zones. In the first method, traditional cement stabilisation is used, whereas the second solution makes use of a geocomposite anchored by steel anchors. The paper presents some results from an environmental study for railway transition zones based on the demonstration case. The results of the performed LCA showed that, in the case of track renewal for transition zones by means of a geocomposite and anchors, the environmental impact is lower than in the case when cement stabilisation works are performed. Less extensive excavation works and thus lower quantities of used material are additional benefits.
Keywords:Railways  life cycle assessment  geosynthetics  transition zone  rail maintenance  environmental impact
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号