白鹤滩首蓄期变形预测混合模型方法北大核心CSCD
引用本文:隗轶伦,胡昱,王亚军,谭尧升,刘春风,裴磊.白鹤滩首蓄期变形预测混合模型方法北大核心CSCD[J].水力发电学报,2022,41(5):84-92.
作者姓名:隗轶伦  胡昱  王亚军  谭尧升  刘春风  裴磊
作者单位:浙江海洋大学 海洋工程装备学院,浙江 舟山 316000,清华大学 水沙科学与水利水电工程国家重点实验室,北京 100084,中国长江三峡集团有限公司,北京 100038;中国三峡建工(集团)有限公司,成都 610041
基金项目:中国长江三峡集团公司科研项目;国家自然科学基金
摘    要:首蓄期准确预测坝体变形,合理安排蓄水计划对于特高拱坝安全进入运行期具有重要意义。为解决特高拱坝首蓄期坝体变形预测较难的问题,本文提出了一种特高拱坝首蓄期坝体变形预测混合模型方法,并结合白鹤滩特高拱坝首蓄期坝体变形监测资料进行工程实例验证。该模型结合白鹤滩特高拱坝首蓄期三阶段蓄水计划的背景,结合三个蓄水目标下白鹤滩拱坝拱冠梁坝段正垂测点的监测数据量大小,在首蓄期初期采用多元回归模型,在首蓄期中后期对PLdb18-2到PLdb18-6五个测点采用优化的LSTM模型,对于坝顶的PLdb18-1采用多元回归模型。本文针对混合模型及全过程采用单一模型的预测结果和实测结果进行对比,本文提出的混合模型方法精度最高,误差率不超过4%,且具有较好鲁棒性。

关 键 词:水利工程  特高拱坝  首蓄期  变形  多元回归  LSTM  混合模型

Hybrid model method for deformation prediction of Baihetan arch dam during initial impoundment
WEI Yilun,HU Yu,WANG Yajun,TAN Yaosheng,LIU Chunfeng,PEI Lei.Hybrid model method for deformation prediction of Baihetan arch dam during initial impoundment[J].Journal of Hydroelectric Engineering,2022,41(5):84-92.
Authors:WEI Yilun  HU Yu  WANG Yajun  TAN Yaosheng  LIU Chunfeng  PEI Lei
Abstract:Accurate prediction of the dam deformation during initial impoundment and a reasonable water impounding scheme are of great significance to the safe transition of a new extra-high arch dam into normal operation. To overcome the difficulties in the prediction, this paper presents a hybrid model method for the predictions of a very high arch dam, and validates it against the monitoring data of initial impounding deformation of Baihetan dam. In this method, we consider a three-stage scheme for the initial impoundment of the dam and the size of monitoring data from its crown beam section required by this scheme. It adopts two models - a multiple regression model for the first stage, and an optimized LSTM model and this regression model for five measurement points of PLdb18-2 to PLdb18-6 and the dam crown point PLdb18-1 respectively in the middle and last stages. Predictions using this hybrid model and a single model are verified against the measurements, and it shows our hybrid model method is robust and more accurate with an error lower than 4%.
Keywords:hydraulic engineering  extra-high arch dam  initial impounding period  deformation  multiple regression  LSTM  hybrid model  