沙湾电站坝下消能防冲试验研究 |
| |
引用本文: | 张湛,尹崇清.沙湾电站坝下消能防冲试验研究[J].电网与水力发电进展,2007,23(1):56-59. |
| |
作者姓名: | 张湛 尹崇清 |
| |
作者单位: | 重庆交通大学西南水运工程科学研究所 重庆400016 |
| |
摘 要: | 通过水工模型试验,论证方案的可行性,对闸下水流流态、流速分布、坝下消能进行了系统研究。并对枢纽布置及结构尺寸进行优化
|
关 键 词: | 流速 流态 消能防冲 |
文章编号: | 1671-4768(2007)01-0056-04 |
修稿时间: | 2006年12月1日 |
Experimental Study on Energy Dissipation and Scouring for Shawan Hydropower Station |
| |
Authors: | ZHANG Zhan YIN Chong-qing |
| |
Abstract: | Through the hydraulic model test,the feasibility of design scheme was demonstrated,and systematic research on flow regime and distribution of flow velocity under floodgate,disappear work downstream the dam were studied,and layout of whole pivot and physical dimension were optimized. |
| |
Keywords: | flow velocity flow regime dissipation and scouring |