首页 | 官方网站   微博 | 高级检索  
     

爆破机理的推墙假说研究
引用本文:段海峰,侯运炳,燕洪全,程建中,孔令彪,冯述虎.爆破机理的推墙假说研究[J].矿业研究与开发,2003,23(1):41-44.
作者姓名:段海峰  侯运炳  燕洪全  程建中  孔令彪  冯述虎
作者单位:1. 中国矿业大学北京校区,北京,100083
2. 包钢白云鄂博铁矿,内蒙古,包头市,014080
摘    要:在长期的露天矿台阶爆破实践中,发现前排孔抵抗线过小是爆破产生极底的主要原因之一。作者在几个基本命题的基础上,提出了爆破机理的推墙假说,及以此为理论基础的前排孔加密爆破技术,推墙假说认为,两孔间的贯穿是两孔中炸药的爆炸力向自由面合推墙效应的结果,且要求岩墙厚度适度,均匀,有充足的补偿空间,且施力均衡。而大区微差爆破则是把一堵厚岩墙分成若干个薄岩墙,然后分别推倒,所以,微差挤压爆破不如前排孔退后且加密。还指出前排孔加密爆破技术应采用三角形布孔,排间起爆,以便达到合推的效果。

关 键 词:爆破机理  露天台阶爆破  推墙假说  爆破根底  爆炸力
文章编号:1005-2763(2003)01-0041-04
修稿时间:2002年8月26日

A Study on the Pushing Wall Hypothesis for Blasting Mechanism
Duan Hai feng,Hou Yun bing,Yan Hong quan,Cheng Jian zhong,Kong Ling biao,Feng Shu hu.A Study on the Pushing Wall Hypothesis for Blasting Mechanism[J].Mining Research and Development,2003,23(1):41-44.
Authors:Duan Hai feng  Hou Yun bing  Yan Hong quan  Cheng Jian zhong  Kong Ling biao  Feng Shu hu
Affiliation:Duan Hai feng 1,Hou Yun bing 1,Yan Hong quan 2,Cheng Jian zhong 2,Kong Ling biao 1,Feng Shu hu 1
Abstract:In the long-term bench blasting practice of open pit mining, it is found that the primary reason for toe left in blasting operations is due to the excessive small burden of the first row of holes. Based on the several fundamental propositions, the pushing wall hypothesis is put forward for the blasting mechanism and the new blasting technology using denser holes of first row is proposed based on this fundamental theory. According to the pushing wall hypothesis, the thorough connection of two neighboring holes is the result of pushing a wall toward the free face by the combined force of blasting of the charges inside these two holes under the conditions that the rock wall should have a proper thickness and homogeneity and provide enough compensation space and perform even exertion of the blasting force. For millisecond blasting in a large area, the thick rock wall is divided into several thin rock walls which are pushed down respectively. Therefore, the result of millisecond squeezed blasting is not as good as the blasting with retreated and densed the holes of first row. It is pointed out that a triangular hole layout and inter-row igniting blasting should be adopted with the densed the hole of first row blasting technology so as to reach the result of joined pushing.
Keywords:Bench blasting in open pit  Hypothesis on pushing wall  Fundamental propositions  Left toe  
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《矿业研究与开发》浏览原始摘要信息
点击此处可从《矿业研究与开发》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号