首页 | 官方网站   微博 | 高级检索  
     

BIM在水库移民安置点基础设施设计中的应用
引用本文:潘菲菲.BIM在水库移民安置点基础设施设计中的应用[J].人民长江,2017,48(1):97-102.
作者姓名:潘菲菲
作者单位:长江勘测规划设计研究有限责任公司 工程移民规划研究院,湖北 武汉,430010
摘    要:水库移民安置点基础设施工程设计主要内容包括道路、竖向、给排水、电力通信等。在制定安置点方案过程中,由于移民想法经常发生变化,因而规划布局具有不确定性,设计工作常需重复调整,工程量大。为了适应安置点方案的多变性,将BIM应用于移民安置点基础设施工程设计中,建立了场地、道路及管网等设施的三维模型,实现三维曲面、横断面、纵断面、标注等数据的动态更新,自动生成各种图形并计算相应工程量,且图形和工程量会随模型的变化而及时更新。与传统方法相比,该方法可大幅提高设计效率,使设计成果更加直观。

关 键 词:基础设施    工程设计    BIM    移民安置点    水库移民  

Application of BIM in infrastructure design of reservoir resettlement sites
PAN Feifei.Application of BIM in infrastructure design of reservoir resettlement sites[J].Yangtze River,2017,48(1):97-102.
Authors:PAN Feifei
Abstract:Infrastructure design of resettlement sites mainly includes: road, elevation planning, water supply and drainage, power supply and communications for resettlement sites. Due to frequent changes of immigrants' ideas and the uncertainty of planning and layout, devising resettlement site scheme often involves large engineering quantities and repeated adjustment of design. To adapt to the variability of resettlement site scheme, BIM is applied to infrastructure design of resettlement sites, and three-dimensional models for site, roads, pipelines and other facilities are established. With these models, all data on three-dimensional surfaces, transverse sections, longitudinal sections and marks can be updated, various graphs can be automatically generated and the corresponding engineering quantities can be calculated. Meanwhile, the graphs and quantities can be timely updated with the change of models. Compared with traditional methods, BIM, which can greatly enhance design efficiency and make the design results more directly perceived, has obvious advantages in scheme comparison and selection.
Keywords:infrastructure  engineering design  BIM  resettlement sites  reservoir resettlement  
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《人民长江》浏览原始摘要信息
点击此处可从《人民长江》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号