首页 | 官方网站   微博 | 高级检索  
     

宝泉抽水蓄能电站计算机监控系统国产化改造方法研究
引用本文:刘鹏龙,吴小锋,方书博,刘晓波,张毅,白剑飞,张煦,王秋实.宝泉抽水蓄能电站计算机监控系统国产化改造方法研究[J].中国水利水电科学研究院学报,2021,19(6):590-597.
作者姓名:刘鹏龙  吴小锋  方书博  刘晓波  张毅  白剑飞  张煦  王秋实
作者单位:河南国网宝泉抽水蓄能有限公司, 河南 新乡 453000;北京中水科水电科技开发有限公司, 北京 100038
基金项目:中国水科院三型人才专项(AU0145B852017);中国水科院基本科研业务费专项(AU0145B482019);中国水科院创新团队专项(AU0145B022033)
摘    要:本文研究了宝泉抽水蓄能电站计算机监控系统国产化改造方法。该电站计算机监控系统是由国外供货且LCU主机采用工控机,这种监控系统的改造在国内没有先例。本文系统总结了宝泉抽水蓄能电站监控系统国产化改造方案研究方法,主要内容包括水电站现场安全测试、以太网协议类型筛选、通信应用层协议测试等方法研究,而通信应用层协议测试研究方法又是其中的核心内容。本文逐一研究了通信应用层协议,分析了这些方法各自特点及其在该电站应用的可行性。应用本文提出的数据包分析方法,顺利完成了宝泉抽水蓄能电站计算机监控系统国产化改造方案研究。

关 键 词:方法研究  抽水蓄能  计算机监控系统  国产化  改造  应用层协议
收稿时间:2020/7/31 0:00:00

The methods study on domestic modification for computer supervision and control system of Baoquan Pumped Storage Hydropower Station
LIU Penglong,WU Xiaofeng,FANG Shubo,LIU Xiaobo,ZHANG Yi,BAI Jianfei,ZHANG Xu,WANG Qiushi.The methods study on domestic modification for computer supervision and control system of Baoquan Pumped Storage Hydropower Station[J].Journal of China Institute of Water Resources and Hydropower Research,2021,19(6):590-597.
Authors:LIU Penglong  WU Xiaofeng  FANG Shubo  LIU Xiaobo  ZHANG Yi  BAI Jianfei  ZHANG Xu  WANG Qiushi
Affiliation:State Grid Henan Baoquan Pumped Storage Co., Ltd., Xinxiang 453000, China;Beijing IWHR Technology Co., Ltd., Beijing 100038, China
Abstract:This paper focuses on modification schemes for Computer supervision and control system of Baoquan Pumped Storage Hydropower Station. The system was supplied by European manufacturer, the main computer of its LCU is IPC. There is not successful modification case for this mode. This paper has studied systematically domestic modification methods for computer supervision and control system of Baoquan Pumped Storage Hydropower Station. The contents include research methods for safe methods for site test, discriminating protocol type of Ethernet network, and the application protocol for Baoquan Pumped Storage Hydropower Station. The study on discriminating protocol type of Ethernet network is hard core. These methods had applied successfully on the study for domestic modification schemes for Baoquan Pumped Storage Hydropower Station. The result of this research may be referenced by units involved in the research, design and operation related which are related to pumped storage hydropower station.
Keywords:method study  pumped storage  computer supervision and control system  domestication  modification  application protocol
点击此处可从《中国水利水电科学研究院学报》浏览原始摘要信息
点击此处可从《中国水利水电科学研究院学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号