首页 | 官方网站   微博 | 高级检索  
     

“绑定中测试”“多绑一测”方式对于测试过程的影响
引用本文:秦振陆,方芳,王伟,朱侠,郭二辉,任福继.“绑定中测试”“多绑一测”方式对于测试过程的影响[J].计算机工程与科学,2016,38(8):1602-1608.
作者姓名:秦振陆  方芳  王伟  朱侠  郭二辉  任福继
作者单位:;1.合肥工业大学计算机与信息学院;2.合肥工业大学情感计算与先进智能机器安徽省重点实验室;3.中国电子科技集团第三十八研究所
基金项目:国家自然科学基金重点项目(61432004);国家自然科学基金(61474035,61204046,61306049 );安徽省科技攻关项目(1206c0805039);安徽省自然科学基金(1508085QF129);教育部新教师基金(20130111120030)
摘    要:随着半导体工艺水平的不断发展,3D芯片技术已成为一大研究热点。"绑定中测试"环节的提出对于芯片的测试流程有了新的要求。但是,"绑定中测试""一绑一测"的特点会使部分裸片被重复测试,从而带来测试时间的增加。从"绑定中测试"的过程出发,协同考虑测试功耗与"理论制造成本"对于"绑定中测试"的影响,提出"多绑一测"的测试流程。在此基础上提出相应的广度优先遍历算法,结合ITC’02电路的相关参数,体现本文思想在实际生产制造中的现实意义。

关 键 词:绑定中测试  多绑一测  功耗约束  “理论制造成本”约束
收稿时间:2016-04-15
修稿时间:2016-08-25

Impact of “one testing after multiple bondings” on the testing process in “mid-bond tests”
QIN Zhen-lu,FANG Fang,WANG Wei,ZHU Xia,GUO Er-hui,REN Fu-ji.Impact of “one testing after multiple bondings” on the testing process in “mid-bond tests”[J].Computer Engineering & Science,2016,38(8):1602-1608.
Authors:QIN Zhen-lu  FANG Fang  WANG Wei  ZHU Xia  GUO Er-hui  REN Fu-ji
Affiliation:(1.School of Computer and Information,HeFei University of Technology,Hefei 230009; 2.Anhui Province Key Laboratory of Affective Computing and Advanced Intelligent Machine,Hefei University of Technology,Hefei 230009; 3.The 38th Research Institute,China Electronics Technology Group Corporation,Hefei 230009,China)
Abstract:With the continuous development of semiconductor technology, 3D chip technology has become a hot research highlight, and the process of chip testing has a new requirement for “mid-bond tests”. But for the “mid-bond test”, “one testing after every bonding” makes some dies repeat testing, thus resulting in an increase of test time. We put forward a "one testing after multiple bondings" testing process which considers the effect of test power consumption and "theoretical manufacturing cost". Besides, we also introduce a breadth first traversal algorithm, which combines the relevant parameters of ITC'02 circuit. The combination reflects our proposal's practical significance in actual production.
Keywords:mid-bond test  one testing after multiple bondings  power constrains  theoretical manufacturing cost constrains  
点击此处可从《计算机工程与科学》浏览原始摘要信息
点击此处可从《计算机工程与科学》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号