首页 | 官方网站   微博 | 高级检索  
     

应用三维千斤顶精确安装海上大型预制箱梁施工技术
引用本文:戴,鹏.应用三维千斤顶精确安装海上大型预制箱梁施工技术[J].水运工程,2015(9):178-181.
作者姓名:  
作者单位:中交一航局第二工程有限公司,山东 青岛 266071
摘    要:随着码头建设逐步迈向深水化、外海化,带动上部预制梁板向大型化发展,但外海海况恶劣,传统起重船安装工艺无法保证精度。以青岛港董家口港区40万t矿石码头为例介绍外海精确安装500 t预制箱梁的整套施工工艺,主要包括采用海上塔吊、三维千斤顶与调梁扁担结合使用等。该工艺的成功实施,为海上大型预制箱梁的安装开辟了新思路。

关 键 词:大型预制箱梁  起重船  三维千斤顶  调梁扁担

Technique for accurate installation of large-scale prefabricated box girder by 3-D jack offshore
DAI Peng.Technique for accurate installation of large-scale prefabricated box girder by 3-D jack offshore[J].Port & Waterway Engineering,2015(9):178-181.
Authors:DAI Peng
Affiliation:The Second Construction Company of CCCC First Harbor Engineering Co.,Ltd.,Qingdao 266071,China
Abstract:The tendency of deep water and offshore wharf construction leads to the enlargement of the upper precast beam slab.However,due to severe offshore conditions,the installation process by conventional rigging boat is insufficient in ensuring accuracy.Taking Dongjiagang 400 000 ton class mining wharf of Qingdao port for example,we introduce a complete set of accurate installation process for 500 t precast box girder at offshore,which mainly includes a combination adoption of offshore tower crane,3-D jack and beam-adjustment lever.
Keywords:large-scale precast box girder  rigging boat  3-D jack  beam-adjustment lever
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《水运工程》浏览原始摘要信息
点击此处可从《水运工程》下载全文