小湾水电站大型尾水肘管制造和安装 |
| |
引用本文: | 赵七美.小湾水电站大型尾水肘管制造和安装[J].水电站机电技术,2007,30(3):29-31. |
| |
作者姓名: | 赵七美 |
| |
作者单位: | 中国水电十四局机电安装总公司 云南 |
| |
摘 要: | 总结了小湾水电站尾水肘管的制造和安装技术,对其关键工序作了重点论述,以期对其它电站大型尾水肘管的制造和安装提供借鉴。
|
关 键 词: | 小湾水电站 大型尾水肘管 制造 安装 |
文章编号: | 1672-5387(2007)03-0029-03 |
修稿时间: | 2007-01-04 |
Fabrication and installation of draft-tube elbow of Xiaowan Hydropower Station |
| |
Authors: | ZHAO Qi-mei |
| |
Abstract: | Six mixed-flow hydro-generating units of 700MW each are installed in the underground powerhouse of Xiaowan Hydropower Station. One draft-tube elbow consists of ten sections. The inlet port is round and the outlet port is long and round. This paper summarizes the fabricating and installing technique of the draft-tube elbow of Xiaowan Hydropower Station, emphatically discusses the key processes. |
| |
Keywords: | Xiaowan Hydropower Station large draft-tube elbow fabrication installation |