摘    要:为研究预应力锚索对大跨地下工程开挖稳定的影响,以大跨度扁平地下洞库开挖稳定为例,采用数值模拟的方法对锚索预应力值和间距两个因素进行分析研究,获得不同锚索预应力值和间距下地下工程的拱顶位移、衬砌最大主应力的分布规律,结果表明:随着锚索预应力值的增加,拱顶位移、衬砌最大主应力在逐渐降低,而锚索最大应力呈现先增加后减小的趋势;随着锚索间距的增加,拱顶位移、衬砌最大主应力在逐渐升高,而锚索最大应力同样呈现先增加后减小的趋势;建议锚索预应力值取200 t、间距取5 m较为适宜。

关 键 词:预应力锚索  地下工程  开挖稳定  数值模拟  拱顶位移
收稿时间:2018/6/6 0:00:00

Research on the effect of prestressed cable on excavation stability of large-span underground engineering
Authors:YUAN Weize  XU Gancheng  XU Jingmao  XING Yichuan and WEI Yingqi
Affiliation:Geotechnical Research Institute, China Institute of Water Resources and Hydropower Research, Beijing 100038;Engineering Design and Research Institute, The Air Force Academy, Beijing 100068,Engineering Design and Research Institute, The Air Force Academy, Beijing 100068,National Defence Engineering Institute, Academy of Military Sciences PLA China, Luoyang. 471023,Geotechnical Research Institute, China Institute of Water Resources and Hydropower Research, Beijing 100038 and Geotechnical Research Institute, China Institute of Water Resources and Hydropower Research, Beijing 100038
Abstract:In order to analyze the effect of prestressed cable on the excavation stability of super-span underground engineering, taking a large span underground engineering as the example, the prestress value and space of prestressed cable were analyzed by numerical simulation. The principle of vault displacement and liner maximum principal stress under different prestress value and space of prestressed cable were obtained. The results show that with the increase of the anchor cable prestress the vault displacement and liner maximum principal stress decrease gradually, however, the maximum stress of the anchor cable shows a trend of increasing at first and then decreasing. With the increase of the space of anchor cable, the vault displacement and liner maximum principal stress increase gradually, the maximum stress of the anchor cable shows a trend of increasing at first and then decreasing. It is recommended that the prestress value of the anchor cable should be 200 tons and the space should be 5 m.
Keywords:Prestressed cable  underground engineering  excavation stability  numerical simulation  vault displacement
本文献已被 CNKI 等数据库收录!
点击此处可从《河北工程大学学报》浏览原始摘要信息
点击此处可从《河北工程大学学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号