首页 | 官方网站   微博 | 高级检索  
     

平湖油气田稀油高渗透底水油藏水平井开发跟踪研究
引用本文:杨耀忠,昌峰,张世明,陈荣华,孙业恒,徐宽正,韩子臣.平湖油气田稀油高渗透底水油藏水平井开发跟踪研究[J].石油勘探与开发,2003,30(1):90-92.
作者姓名:杨耀忠  昌峰  张世明  陈荣华  孙业恒  徐宽正  韩子臣
作者单位:1. 中国矿业大学,北京校区;中国石化胜利油田地质科学研究院
2. 上海石油天然气总公司油藏开采部
3. 中国石化胜利油田地质科学研究院
摘    要:东海平湖油气田的H2^3 4油藏为块状底水油藏,参数敏感性研究认为:水平井开发H2^3 4油藏效果明显,水平井应沿构造长轴方向布井,长度以600m为宜。设计的A3水平井目前含水36%,日产油423m^3,采油速率为3.5%,处于中含水低速开发阶段。油藏动态跟踪研究与开发实践相结合,可以及时调整和修改开发技术政策,缓解开发矛盾。经过动态跟踪研究对地质模型及开发方案进行调整后,采收率比初期开发方案设计指标提高5.01%。

关 键 词:平湖油气田  稀油  高渗透底水油藏  水平井  开发  跟踪  研究  优化
文章编号:1000-0747(2003)01-0090-03
修稿时间:2001年12月10

Continuously monitoring the horizontal well development performance of Pinghu oil-gas field with low viscosity and high permeability and bottom water
YANG Yaozhong,CHANG Feng,ZHANG Shiming,CHEN Ronghu,SUN Yeheng,XU Kuanzheng and HAN Zichen.Continuously monitoring the horizontal well development performance of Pinghu oil-gas field with low viscosity and high permeability and bottom water[J].Petroleum Exploration and Development,2003,30(1):90-92.
Authors:YANG Yaozhong  CHANG Feng  ZHANG Shiming  CHEN Ronghu  SUN Yeheng  XU Kuanzheng and HAN Zichen
Affiliation:YANG Yao-zhong 1,2,CHANG Feng 3,ZHANG Shi-ming 2,CHEN Rong-hua 3,SUN Ye-heng 2,XU Kuan-zheng 3,HAN Zi-chen 2
Abstract:H 2 3+4 reservoir of Pinhu oilfield is the bottom water drived lumpish reservoir in East China Sea.The research of reservoir parameter sensitivity has identified that the development effect using the horizontal well to H 2 3+4 reservoir is well, the horizontal wells would be arranged along the major axis of the structure and 600 meters would be suitable for the drilling lenth of the horizontal well.At present,watercut of the devised horizontal well A3 is 36%,its production rate is 423 m 3,and the oil recovery rate is 3.5%,so it is at the middle watercut development stage with low rate. The combination of continuously monitoring the reservoir with the development practice can adjust and modify the development technology administrative policy in time and improve the development contradiction.After the adjustment of the development project by using the continuously monitoring research,the recovery rate of the reservoir has rised 5.01% higher than that of primary development project.
Keywords:horizontal well  optimization  monitoring  reservoir  development
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《石油勘探与开发》浏览原始摘要信息
点击此处可从《石油勘探与开发》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号