首页 | 官方网站   微博 | 高级检索  
     


Applying kaizen to the schedule in a concurrent environment
Authors:Luis Villar-Fidalgo  María del Mar Espinosa Escudero  Manuel Domínguez Somonte
Affiliation:Programa de Tecnologías Industriales, Escuela Internacional de Doctorado, Universidad Nacional de Educación a Distancia (UNED), Madrid, Spain
Abstract:Not only ETO (Engineering to Order), but even serial production industry should know how to deal with projects and their schedule: plant commissioning, shutdown, introducing new products and similar circumstances should be managed with adequate planning and resource allocation techniques to create a schedule useful in decision making during the execution. The current complex reality, with evolving technologies and fierce pressure to reach the market as soon as possible, pushes the project managers to use more advanced techniques than waterfall planning, such as agile or lean. It also requires them to take a holistic view and manage concurrent tasks in complex projects. The contributions of this paper are two: the proposal to control specific parallel groups of waterfall activities under uncertain environments, which can lead to iterations and reworks, as a single concurrent Activity Managed by Kanban Methods (AMKM). This activity can be subsequently embedded into traditional scheduling approaches as CPM-PERT. The second contribution is the feasibility of its application in industrial environments due to the affordability of simulation software. Two use cases are shown as evidence. It is not a disruptive proposal, but a kaizen action based on very mature technologies. Finally, it is suggested some improvements to be implemented in Project Management Software due to this ‘kaizen’ proposal.
Keywords:Kanban agile method  concurrent engineering  scheduling
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号