首页 | 官方网站   微博 | 高级检索  
     


Time-Profit Trade-Off Analysis for Construction Projects
Authors:Ahmed Senouci  Khaled El-Rayes
Affiliation:1Associate Professor, Dept. of Civil Engineering, Univ. of Qatar, P.O. Box 2713, Doha, Qatar. E-mail: a.senouci@qu.edu.qa
2Associate Professor, Dept. of Civil and Environmental Engineering, Univ. of Illinois at Urbana–Champaign, Urbana, IL 61801. E-mail: elrayes@uiuc.edu
Abstract:This paper presents a multiobjective optimization model that provides new and unique capabilities including generating and evaluating optimal/near-optimal construction resource utilization and scheduling plans that simultaneously minimize the time and maximize the profit of construction projects. The computations in the present model are organized in three major modules: (1) a scheduling module that develops practical schedules for construction projects; (2) a profit module that computes the project profit; and (3) a multiobjective module that searches for and identifies optimal/near optimal trade-offs between project time and profit. A large-scale construction project is analyzed to illustrate the use of the model and to demonstrate its capabilities in generating and visualizing optimal trade-offs between construction time and profit.
Keywords:Algorithms  Optimization  Construction industry  Profits  Scheduling  
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号