低透气性高瓦斯煤层深孔控制预裂爆破增透技术
引用本文:弓美疆,池鹏,张明杰. 低透气性高瓦斯煤层深孔控制预裂爆破增透技术[J]. 煤炭科学技术, 2012, 40(10): 69-72
作者姓名:弓美疆  池鹏  张明杰
作者单位:1. 阳煤集团寿阳煤炭管理公司通风管理处,山西寿阳,045400
2. 开滦(集团)有限责任公司唐山矿业分公司,河北唐山,063000
3. 河南理工大学安全科学与工程学院,河南焦作,454000
摘    要:为了解决低透气性高瓦斯煤层难抽采问题,运用RFPA2D数值模拟软件,建立了2种深孔控制预裂爆破力学模型,通过对模拟结果进行对比分析,得出一套适用于鹤煤八矿底板抽采的爆破参数,并进行了现场试验,爆破后煤层透气性系数平均值达到了2.23 m2/(MPa2.d),比爆破前测定的煤层原始透气性平均值提高了近3.05倍,说明该技术可以明显提高钻孔周围煤体裂隙发育程度,煤体透气性增加,达到了提高煤层瓦斯抽采量和抽采率的目的。

关 键 词:瓦斯抽采  深孔控制预裂爆破  煤层裂隙  煤层透气性

Permeability Increase with Deep Borehole Controlled Pre-cracking Blasting Technology in Low Permeability and High Gassy Seam
GONG Mei-jiang,CHI Peng,ZHANG Ming-jie. Permeability Increase with Deep Borehole Controlled Pre-cracking Blasting Technology in Low Permeability and High Gassy Seam[J]. Coal Science and Technology, 2012, 40(10): 69-72
Authors:GONG Mei-jiang  CHI Peng  ZHANG Ming-jie
Affiliation:1.Ventilation Control Division,Shouyang Coal Management Company,Yangquan Coal Mining Group,Shouyang 045400,China; 2.Tangshan Mining Company,Kailuan Group Corporation Ltd.,Tangshan 063000,China; 3.School of Safety Science and Engineering,Henan Polytechnic University,Jiaozuo 454000,China)
Abstract:In order to solve the difficult gas drainage problem in low permeability and high gassy seam,the RFPA2D numerical simulation software was applied to establish two deep borehole controlled pre-cracking blasting mechanics models.With the comparison and analysis on the simulation results,a set of blasting parameters obtained which were suitable for floor gas drainage in No.8 mine of Hegang Coal Mining and the site trial with the parameters was conducted.The results showed that after the blasting,the average value of the seam permeability coefficient reached at 2.23 m2/(MPa2·d)and 3.05 times higher than the average value of the seam in-situ permeability before the blasting conducted.Thus the technology could obviously improve the cracking development degree of coal around the borehole and could improve the permeability of the seam.The target to improve the seam gas drainage value and the gas drainage rate could be reached.
Keywords:gas drainage  deep borehole controlled pre-cracking blasting  seam crack  seam permeability