首页 | 官方网站   微博 | 高级检索  
     

合肥发电厂SG420t/h自然循环锅炉降低排烟温度的研究
引用本文:郑升,刘静.合肥发电厂SG420t/h自然循环锅炉降低排烟温度的研究[J].安徽电气工程职业技术学院学报,2002,7(1):48-51.
作者姓名:郑升  刘静
作者单位:合肥发电厂,合肥,230041
摘    要:通过大修前锅炉热力试验,量化分析影响锅炉排烟温度的因素及程度,在大修中实施制粉系统堵漏、炉膛堵漏、空预器传热元件更换等技术措施,在运行中采取制粉系统钢球磨进口微负压、炉膛微负压等运行方式,是降低排烟温度的有效措施.文章同时指出,彻底消除制粉系统漏冷风以及解决空预器X比、烟气侧效率、空气侧阻力、烟气侧阻力、空预器出口热风温度达不到设计值和锅炉受热面积灰问题,是今后进一步降低#3锅炉排烟温度的努力方向.

关 键 词:排烟温度  实施方案  技术措施
文章编号:1009-1238(2002)01-0048-04

The study of reducing exhaust-gas temperature for SG420t/h natural circulation boiler in HeFei Power Plant
Abstract:After the pre-overhaul boiler thermal test,we analyzed the factors and detent that affected the boiler exhaust-gas temperature by the test data.In the overhaul,we executed the coal-powder system's leakage sealing,boiler chamber leakage sealing and the heat sinks replacement of pre-air heater etc.technical skills;during the operating,we took the operation mode of keeping micro-negative pressure of the ball tube mill inlet in the coal-powder system and the micro-negative pressure of boiler chamber,these are the effective measurements of reducing the exhaust-gas temperature.The article point out that it is the future struggling direction of further feducing the boiler 3 exhaust-gas temperature,which completely eliminate the cold-air leakage in the coal-powder system,solving the "X" ratio of the pre-air teater,the heat efficiency of the exhaust-gas side,the resistance force of the air side,the resistance force of exhaust-gas side and the under-design value of the pre-air heater outlet air temperature and the defect of the boiler heating surface dust-deposit.
Keywords:Exhaust-gas temperature Execution project Technical measurement
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号