批量生产柔性作业车间多目标精细化调度方法
引用本文:曾强,沈玲,潘启东,吴立云.批量生产柔性作业车间多目标精细化调度方法[J].计算机工程与应用,2014(2):263-270.
作者姓名:曾强  沈玲  潘启东  吴立云
作者单位:[1]河南理工大学能源科学与工程学院,河南焦作454000 [2]河南理工大学安全科学与工程学院,河南焦作454000
基金项目:国家自然科学基金(No.51104056);河南省教育厅科学技术研究项目(No.128120005);河南理工大学博士基金资助项目(No.B2011-088).
摘    要:提出了一种批量生产柔性作业车间多目标精细化调度方法。针对批量生产柔性作业车间多目标调度问题特点,建立了一类以完工时间最短和制造成本最低为优化目标的等量分批柔性作业车间调度多目标优化模型。提出了5种批量生产柔性作业车间精细化调度技术;设计了一种改进的NSGA II算法对模型进行求解。算法中引入面向对象技术处理复杂的实体逻辑关系,使用矩阵编码技术进行编码,采用分段交叉和分段变异的遗传算子实现遗传进化,应用上述5种精细化调度技术于解码过程以提高设备利用率。通过案例分析验证了该方法的有效性。

关 键 词:柔性作业车间调度  精细化调度  多目标优化  改进NSGA  Ⅱ算法

Multi-objective elaborate scheduling method for batch productionFJSP
ZENG Qiang,SHEN Ling,PAN Qidong,WU Liyun.Multi-objective elaborate scheduling method for batch productionFJSP[J].Computer Engineering and Applications,2014(2):263-270.
Authors:ZENG Qiang  SHEN Ling  PAN Qidong  WU Liyun
Affiliation:1.School of Energy Science and Engineering, Henan Polytechnic University, Jiaozuo, Henan 454000, China 2.School of Safety Science and Engineering, Henan Polytechnic University, Jiaozuo, Henan 454000, China
Abstract:A multi-objective elaborate scheduling method for batch production Flexible Job Shop Scheduling Problem (FJSP) is proposed. Aiming at the characteristic of batch production FJSP, a multi-objective optimization model is estab- lished with the objective to minimize the makespan and the total manufacturing cost. Five elaborate scheduling techniques for batch production flexible job shop scheduling problem are proposed. An improved NSGA II algorithm is presented and designed to resolve the model. In the algorithm, a technique of object oriented is introduced to deal with the compli- cated logical relation between different entities, an array coding technique is used to code the individuals, a segmented crossover and mutation operator is used to implement genetic evolution, the above five elaborate scheduling techniques are applied to improve the utilization ratio of machines during the decoding process. The effectiveness of the proposed research is validated by case study.
Keywords:flexible job shop scheduling  elaborate scheduling  multi-objective optimization  improved NSGA II algorithm