首页 | 官方网站   微博 | 高级检索  
     

千米级斜拉桥拉索制造及施工关键技术研究
引用本文:王正林.千米级斜拉桥拉索制造及施工关键技术研究[J].山西建筑,2014(10):171-173.
作者姓名:王正林
作者单位:四川省资阳市若愚路桥建筑工程有限公司,四川资阳641300
摘    要:针对千米级斜拉桥结构及受力的复杂性给施工带来的挑战,基于几何控制理论,以主跨926 m混合梁斜拉桥为研究对象,对斜拉索制造及张拉施工期无应力长度控制进行了研究,提出了相应的施工质量控制措施,为同类大桥施工提供了参考。

关 键 词:斜拉桥  几何控制法  无应力索长  千米级

Research on key technology of cable control during the fabricating and tensioning construction stages of thousand-meter-scale cable-stayed bridge
WANG Zheng-lin.Research on key technology of cable control during the fabricating and tensioning construction stages of thousand-meter-scale cable-stayed bridge[J].Shanxi Architecture,2014(10):171-173.
Authors:WANG Zheng-lin
Affiliation:WANG Zheng-lin (Sichuan Ziyang Ruoyu Highway and Bridge Construction Engineering Co. ,Ltd, Ziyang 641300, China)
Abstract:For the complexity of structural and mechanical behavior of thousand-meter-scale cable-stayed bridge, the construction presents its own challenges. In this study, a hybrid girder cable-stayed bridge in China with a main span of 926 m is used to examine the control of unstressed cable length during the fabricating and tensioning construction stages on the basis of geometry control method. Finally, put forward corresponding quality control measures, providing a reference for similar bridge construction.
Keywords:cable-stayed bridge  geometry control method  unstressed cable length  thousand-meter scale
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号