首页 | 官方网站   微博 | 高级检索  
     

可中断负荷参与备用市场下的可靠性风险电价计算模型
引用本文:李莉,谭忠富,王建军,姜海洋,候建英,王成文.可中断负荷参与备用市场下的可靠性风险电价计算模型[J].电网技术,2009,33(4):81-87.
作者姓名:李莉  谭忠富  王建军  姜海洋  候建英  王成文
作者单位:华北电力大学,北京市,昌平区,102206  
基金项目:国家自然科学基金,北京市哲学社会科学规划项目 
摘    要:可中断负荷(interruptible load,IL)作为用户参与电力市场的一种方式,最直接的影响是为供电公司提供另外一种可供选择的备用资源,在这种环境下,供电可靠性成本的内容也发生了变化,相应的可靠性电价计算模型也应有所调整。首先给出可中断负荷参与备用市场下可靠性电价定价流程,在此基础上量化了IL由于减少系统备用风险购电成本和电网投资改造风险成本而产生的经济效益,最后根据我国国情给出了可靠性电价的定价模型。算例分析表明,可中断负荷参与备用市场可为供电公司节约大量的可靠性投资成本,使其规避高购电电价和高投资的市场风险,进而降低用户支付的可靠性电价。

关 键 词:可靠性电价  可中断负荷  风险购电成本  投资改造风险成本  可靠性成本  电力市场
收稿时间:2008-05-30

A Reliability Risk Pricing Model Based on The Participation of Interruptible Loads in Reserve Market
LI Li,TAN Zhong-fu,WANG Jian-jun,JIANG Hai-yang,HOU Jian-ying,WANG Cheng-wen.A Reliability Risk Pricing Model Based on The Participation of Interruptible Loads in Reserve Market[J].Power System Technology,2009,33(4):81-87.
Authors:LI Li  TAN Zhong-fu  WANG Jian-jun  JIANG Hai-yang  HOU Jian-ying  WANG Cheng-wen
Affiliation:North China Electric Power University;Changping District;Beijing 102206;China
Abstract:As a mode for customers to participate in electricity market, the most direct influence of interruptible load (IL) is to offer another optional backup resource for power supply company. Under such a condition, the content of the cost for power supply reliability will be varied and corresponding reliability pricing calculation model should be adjusted to some extent too. In this paper, at first the flowchart for reliability pricing under the participation of ILs in reserve market given; then on this basis the economic benefit brought by ILs due to the reduction of both systematic reserve risk costs and the power system investment and renovation risk costs is quantified; finally according to concrete condition in China the pricing model for reliability price is determined. Case study results show that power supply company can save a lot of reliability investment costs due to the participation of ILs in reserve market, and the market risk from high power purchase cost and high investment can be evaded, and then the reliability price paid by consumers can be reduced.
Keywords:reliability price  interruptible load  risk electricity purchase cost  investment risk cost  reliability costs  electricity market
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《电网技术》浏览原始摘要信息
点击此处可从《电网技术》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号