工业园区微网调度研究与仿真
引用本文:于 飞,葛思伟,李梅航,张 倩,刘喜梅.工业园区微网调度研究与仿真[J].电力系统保护与控制,2023,51(18):179-187.
作者姓名:于 飞  葛思伟  李梅航  张 倩  刘喜梅
作者单位:青岛科技大学自动化与电子工程学院,山东 青岛 266061
基金项目:国家自然科学基金项目资助(62103218);山东省自然科学基金项目资助(ZR2020MF081)
摘    要:为提高新能源消纳能力和供电经济性、可靠性,研究了含风光柴储、生活负荷、具有有限可控能力工业负荷的工业园区微电网,提出了一种基于日前和日内相结合的优化调度方案。为保证日前优化调度的经济性,提出了一种分段变异优化的改进粒子群算法求解调度模型。改进算法相较于传统粒子群算法收敛性速度更快,同时提高了经济性,减少了园区的运行成本。日内运行时,为了校正日前预测偏差,采用源网荷储共同参与调整,保证尽可能跟随日前经济结果,提高微网系统的可靠性。日内调整建立详细化的仿真模型,采用实时仿真技术。利用实时仿真软件RT-LAB和实时仿真机OP4510构建的实时仿真平台,解决模型仿真用时较长、求解困难的问题,验证了工业园区微网调度策略的可行性。

关 键 词:可控工业负荷  园区微网调度  粒子群算法  实时仿真技术
收稿时间:2022/9/5 0:00:00
修稿时间:2023/8/7 0:00:00

Research on and simulation of microgrid scheduling in an industrial park
YU Fei,GE Siwei,LI Meihang,ZHANG Qian,LIU Ximei.Research on and simulation of microgrid scheduling in an industrial park[J].Power System Protection and Control,2023,51(18):179-187.
Authors:YU Fei  GE Siwei  LI Meihang  ZHANG Qian  LIU Ximei
Affiliation:College of Automation & Electronic Engineering, Qingdao University of Science and Technology, Qingdao 266061, China
Abstract:To promote new energy consumption capacity and economy and reliability of power supply, an industrial park microgrid with wind, solar, diesel, storage, living load and limited controllable industrial load is studied. An optimal scheduling scheme based on the combination of day-ahead and intraday is proposed. To ensure the economy of day-ahead scheduling, an improved particle swarm optimization algorithm with segmented mutation optimization is proposed to analyze the scheduling model. Compared to traditional particle swarm optimization, the improved algorithm has faster convergence speed, while improving economy and reducing the operating cost of the park. When running on the intraday, to correct the deviation in the day ahead prediction, the source, network, load and storage are jointly involved in the adjustment to ensure that the economic results, as much as possible, are followed and to improve the reliability of the microgrid system. Then, it establishes detailed simulation models within intraday using real-time simulation technology. A real-time simulation platform is constructed using real-time simulation software (RT-LAB) and machine (OP4510), to solve the problem of long simulation time and difficulty and verify the feasibility of the industrial park microgrid scheduling strategy.
Keywords:controllable industrial load  park microgrid scheduling  PSO  real-time simulation