首页 | 官方网站   微博 | 高级检索  
     


A heuristic approach for U-shaped assembly line balancing to improve labor productivity
Authors:Shwetank Avikal  Rajeev Jain  PK Mishra  HC Yadav
Affiliation:1. Department of Mechanical Engineering, Motilal Nehru National Institute of Technology, Allahabad, India;2. Department of Mechanical Engineering, Kalaniketan Polytechnic College, Jabalpur, India
Abstract:The assembly line balancing problem is a non deterministic polynomial type planning problem for mass production. Layout design changes constitute a major decision that yields investment for assembly operations and numerous heuristics have been reported in the literature for solving the line balancing problems. U-shaped assembly layout offers several benefits over traditional straight-line layout in implementation of lean manufacturing and Just-In-Time technology. In the paper an attempt has been made to evaluate labor productivity in U-shaped line system and straight line system. A Critical Path Method (CPM) based approach for U-shaped assembly line has been applied for assigning the task to the work stations for assembly line layout. Results show that the CPM based U-shaped approach performs better and improve the labor productivity of assembly line layout.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号