含水弱胶结粉细砂岩地层公路隧道开挖方案比选及二次支护施作时机研究
引用本文:董磊,宋红艳.含水弱胶结粉细砂岩地层公路隧道开挖方案比选及二次支护施作时机研究[J].隧道建设,2014,34(9):849-856.
作者姓名:董磊  宋红艳
作者单位:(1.安徽省高速公路控股集团有限公司, 安徽 合肥 230088; 2.安徽省华运设计咨询有限公司, 安徽 合肥 230031)
摘    要:含水弱胶结砂岩具有黏结力低、水稳性差和流塑变形大等特点,导致隧道支护体系变形在时间及空间维度上表现出不均匀性、非线性及非对称性,继而产生围岩坍塌、支护失效等工程问题。结合某公路隧道建设背景,采用"先让后治"的原则,补强初期支护强度并提供二次衬砌施作条件,提出双层初期支护设计方案,并通过数值技术仿真分析三台阶七步、CRD和双侧壁导坑3种工法下拱顶沉降、水平收敛及塑性区的分布特征。结果表明:1)在成岩差、易流砂地层下,CRD工法为此类地层120 m2断面软弱围岩的最优开挖方法;2)二次支护施作的最佳时机应在上台阶右半幅断面开挖前;3)在有条件的前提下宜将四部交叉中隔壁法演化为六部中隔壁法施工。

关 键 词:公路隧道  含水弱胶结粉细砂岩  开挖方案  二次支护  施作时机  双层支护
收稿时间:2014-05-05

Excavation Scheme Comparison and Secondary Support Installation Timing of Highway Tunnel in Water-containing Poorly-cemented Powder-fine Sandstone
DONG Lei , SONG Hongyan.Excavation Scheme Comparison and Secondary Support Installation Timing of Highway Tunnel in Water-containing Poorly-cemented Powder-fine Sandstone[J].Tunnel Construction,2014,34(9):849-856.
Authors:DONG Lei  SONG Hongyan
Affiliation:(1. Anhui Expressway Holding Group Co., Ltd., Hefei 230088, Anhui, China; 2. Anhui Huayun Design and Consulting Co., Ltd., Hefei 230031, Anhui, China)
Abstract:Water containing poorly cemented powder fine sandstone embodies the characteristics of low adhesive strength, poor stability and serious plasticized deformation, which may lead to the non uniform, non linear and asymmetrical deformation of the tunnel support in time and space, and in the end may lead to collapse and failure of the structure. In the paper, case study is made on a highway tunnel located in water containing poorly cemented powder fine sandstone. Double layer support is proposed to strengthen the primary support and to provide the installation condition of the secondary lining on basis of the principle of “stress releasing before stress control”. Furthermore, the crown settlement, horizontal convergence and plasticized zone distribution of 3 bench 7 step excavation method, CRD excavation method and double side drift excavation method are analyzed by means of FLAC3D. Conclusions drawn are as follows: 1) CRD excavation method is the best excavation method for the tunnel with 120 m2 cross section area located in the described strata; 2) The best timing of secondary primary support construction is before the excavation of the right part of the top heading; 3) Under proper conditions, CRD method with four parts should be transferred to CRD method with six parts.
Keywords:highway tunnel  poorly-cemented powder-fine sandstone  excavation scheme  secondary support  supporting timing  double-layer support