藤子沟水电站混凝土拱坝施工与质量控制
引用本文:向富权,王朝红.藤子沟水电站混凝土拱坝施工与质量控制[J].贵州水力发电,2008,22(2):27-31.
作者姓名:向富权  王朝红
作者单位:中国水利水电第九工程局,贵州,贵阳,550001
摘    要:藤子沟水电站双曲拱坝采用砂岩作为混凝土砂石骨料。砂岩因其具有坚固性低、表观密度偏低、吸水率偏大等超规范指标及骨料内部结构不密实、表面较灰岩骨料粗糙、用水量及水泥用量高、线膨胀系数较灰岩大等特点,因而需根据混凝土原材料情况调整其施工工艺、质量控制、接缝灌浆及温控防裂措施。本文针对藤子沟水电站双曲拱坝混凝土工艺及质量、温控等,对其施工工艺和质量控制进行了详细介绍。

关 键 词:水利水电工程施工  混凝土拱坝  混凝土施工工艺  施工质量控制  藤子沟水电站

Construction & Quality Control of Concrete Arch Dam of Tengzigou Hydropower Station
XIANG Fu-quan,WANG Chao-hong.Construction & Quality Control of Concrete Arch Dam of Tengzigou Hydropower Station[J].Guizhou Water Power,2008,22(2):27-31.
Authors:XIANG Fu-quan  WANG Chao-hong
Affiliation:( Ninth Engineering Bureau for Conservancy & Hydropower of China, Guiyang, Guizhou, 550001, China)
Abstract:A kind of sandstone was adopted as material of concrete aggregate in double arch dam project of Tengzigou Hydropower Station. Sandstone has some features such as low intensity and apparent density, water absorption at high side, low compactness of inside structure, more crude of surface and bigger coefficient of linear expansion than limestone, need more water and cement in mixing, and etc. The process of mixing concrete, therefore, need be adjusted, as well as in order to insure construction quality, some measures must be adopted such as joint grouting, temperature control and anti-checking ones. The article introduces in detail concrete mixing process, quality control measure in constructing double arch dam of Tengzigou Hydropower Station.
Keywords:engineering construction of conservancy and hydropower  concrete arch dam  construction technology  construction quality control  Tengzigou Hydropower Station  
本文献已被 维普 万方数据 等数据库收录!