基于CIM的电网规划管理决策辅助系统
引用本文:罗庆,吴良良,寿挺,朱铁铭,黄民翔.基于CIM的电网规划管理决策辅助系统[J].电力系统保护与控制,2016,44(4):111-117.
作者姓名:罗庆  吴良良  寿挺  朱铁铭  黄民翔
作者单位:浙江大学电气工程学院,浙江 杭州 310027,国网浙江杭州市萧山区供电公司,浙江 杭州311201,国网浙江杭州市萧山区供电公司,浙江 杭州311201,国网浙江杭州市萧山区供电公司,浙江 杭州311201,浙江大学电气工程学院,浙江 杭州 310027
摘    要:针对电网规划所面临的多部门、多层级的低效收资,设计并编程实现了基于CIM的电网规划管理决策辅助系统。该系统以基于CIM模型的数据库设计为底层基础,构建的数据库定期由GIS系统、EMS系统和外部导入进行更新,实现数据共享。功能层面主要分为评估分析模块、规划研究模块以及数据发布模块。评估分析模块主要支持对现状电网供电能力和运行水平的评估工作;规划研究模块主要支持规划设计中的辅助决策工作和规划评价工作;数据发布模块主要支持上述两个模块中数据的发布查询功能。以某地区局部电网为例,验证了该系统的高效实用性以及对电网规划工作良好的指导意义。

关 键 词:数据库  评估分析  决策  电网规划  数据发布
收稿时间:2015/4/23 0:00:00
修稿时间:2015/6/17 0:00:00

Decision support system for power grid planning and management based on CIM
LUO Qing,WU Liangliang,SHOU Ting,ZHU Tieming and HUANG Minxiang.Decision support system for power grid planning and management based on CIM[J].Power System Protection and Control,2016,44(4):111-117.
Authors:LUO Qing  WU Liangliang  SHOU Ting  ZHU Tieming and HUANG Minxiang
Affiliation:College of Electrical Engineering, Zhejiang University, Hangzhou 310027, China,State Grid Zhejiang Hangzhou Xiaoshan Power Supply Company, Hangzhou 311201, China,State Grid Zhejiang Hangzhou Xiaoshan Power Supply Company, Hangzhou 311201, China,State Grid Zhejiang Hangzhou Xiaoshan Power Supply Company, Hangzhou 311201, China and College of Electrical Engineering, Zhejiang University, Hangzhou 310027, China
Abstract:To cope with the inefficient data collection of the power grid planning in multisectors and multilevels, the power grid planning and management decision support system based on CIM is designed and programmed. The database based on CIM model is designed as the underlying basis in the system, the database is regularly updated by the GIS system, marketing system and external introduction, and the data sharing is realized. The functional level is divided into evaluation and analysis module, planning module and data publishing module. Evaluation and analysis module mainly supports the evaluation of power supply capacity and operation level of power grid status; planning module mainly supports the auxiliary decision work and evaluation of the planning and design work; and data publishing module mainly supports the query function of the data issued in the above two modules. The system is verified to be reasonable and high efficient to the power grid planning work in a local distribution network.
Keywords:database  evaluation and analysis  decision-making  power grid planning  data publishing