首页 | 官方网站   微博 | 高级检索  
     

前河金矿下向分层胶结充填法的试验研究
引用本文:肖有鼎,李翕然,王元亮.前河金矿下向分层胶结充填法的试验研究[J].金属矿山,1995(1).
作者姓名:肖有鼎  李翕然  王元亮
作者单位:长沙矿山研究院,河南省前河金矿
摘    要:前河金矿赋存着矿岩不稳定的急倾斜多层薄矿脉,开采技术条件复杂,在现场进行了下向分层胶结充填法的工业试验,实施了多层矿脉组合开采、无掏槽爆破、木架支护和黄泥充填接顶等综合开采技术,取得了较好的开采效果.

关 键 词:下向分层胶结充填,组合开采,无掏槽爆破,黄泥充填接顶

Test-study of Top-slicing Combined with Cemented Filling Method in Qianhe Gold Mine
Xiao Youding, Li Xiran, Wang Yuanliang.Test-study of Top-slicing Combined with Cemented Filling Method in Qianhe Gold Mine[J].Metal Mine,1995(1).
Authors:Xiao Youding  Li Xiran  Wang Yuanliang
Affiliation:Xiao Youding; Li Xiran; Wang Yuanliang
Abstract:Qianhe Gold Mine is a steeply dipping,multilayer thin vein,due to the stability of orerock is relatively poor,the mining technical condition is more complex.For this reasons,the industrial test of top-slicing combined with cemented filling method which use a synthetical mining techniques consisted of the multilayer vein combination mining,the non-cutting blasting,the timber support and soil filling near by immediate roof is carried out
Keywords:Top-slicing  combined with cemented filling  Combination mining  Non-cutting blasting  Soil filling near by immediate roof
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号