首页 | 官方网站   微博 | 高级检索  
     

云南宣威煤矸石热电厂取水防沙模型试验
引用本文:彭钦勇,张金明,王卫光.云南宣威煤矸石热电厂取水防沙模型试验[J].广西水利水电,2014(2):9-12.
作者姓名:彭钦勇  张金明  王卫光
作者单位:[1]四川省达州水文水资源勘测局,四川达州635000 [2]珠江水利科学研究院,广东广州510610
摘    要:通过水工模型试验对云南宣威煤矸石热电厂取水构筑物的布置型式进行验证,对存在的问题提出改进措施,经模型优化后,既能保证电厂正常取水安全要求,又能保障泄洪时各构筑物的稳定性,为工程的设计提供了科学依据。

关 键 词:取水构筑物  取水安全  模型试验

Water intake sand model test of Xuanwei Coal Gangue Thermal Power Plant in Yunnan Province
PENG Qin-yong,ZHANG Jin-ming,WANG Wei-guang.Water intake sand model test of Xuanwei Coal Gangue Thermal Power Plant in Yunnan Province[J].Gx Water Resources & Hydropower Engineering,2014(2):9-12.
Authors:PENG Qin-yong  ZHANG Jin-ming  WANG Wei-guang
Affiliation:1.Hydrology and Water Resources Investigation Bureau of Dazhou City, Sichuan Province, Dazhou 635000, China; 2. Pearl River Hydraulic Research Institute, Guangzhou 510610, China)
Abstract:Hydraulic model test was conducted to check the arrangement of water intake structure of Xuanwei CoalGangue Thermal Power Plant in Yunnan Province. The results of test are scientific basis for engineering designsince the arrangement was improved in accordance with the testing results to ensure water taking safety under nor-mal operating condition as well as structures' stability in case of flood discharge.
Keywords:Water intake structure  water taking safety  model test
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号