如何提高路基分层压实系数一次验收合格率
引用本文:张利勇,曾勇霖,杨青海.如何提高路基分层压实系数一次验收合格率[J].铁道建筑技术,2010(3):130-133.
作者姓名:张利勇  曾勇霖  杨青海
作者单位:中铁十九局集团第四工程有限公司,内蒙古,通辽,028000
摘    要:通过包西铁路通道陕西段路基土方填筑施工过程的实践,分析总结影响路基分层压实系数一次验收合格率的多种因素,有针对性地制定相应工程措施,指导施工生产。

关 键 词:路基  压实系数  验收合格率

On Incresing Percent of Acceptance Pass of Delamination Compacting Coefficient in Roadbed
Zhang Liyong,Zeng Yonglin,Yang Qinghai.On Incresing Percent of Acceptance Pass of Delamination Compacting Coefficient in Roadbed[J].Railway Construction Technology,2010(3):130-133.
Authors:Zhang Liyong  Zeng Yonglin  Yang Qinghai
Affiliation:Zhang Liyong,Zeng Yonglin,Yang Qinghai(China Railway 19th Bureau Group Co. Ltd.,Tongliao 028000,China)
Abstract:According to the repeatedly practice of the earthwork filling during roadbed construction ofAccording to the repeatedly practice of the earthwork filling during roadbed construction of Baoxi Railway in Shaanxi province, through the analysis and summary of all factors which influence percent of acceptance pass of the roadbed compacting coefficient, some main factors were found. In order to instruct the construction better in the future, some engineering measures were established in this paper.
Keywords:roadbed  compacting coefficient  percent of acceptance pass  