首页 | 官方网站   微博 | 高级检索  
     

吹填场区双层软黏土地基超载比与卸载控制试验研究
引用本文:雷华阳,任 倩,卢海滨,李 宾.吹填场区双层软黏土地基超载比与卸载控制试验研究[J].岩土力学,2016,37(11):3072-3078.
作者姓名:雷华阳  任 倩  卢海滨  李 宾
作者单位:1.天津大学 土木工程系,天津 300072;2.天津大学 滨海土木工程结构与安全教育部重点实验室,天津 300072
基金项目:国家自然科学基金项目(No. 51378344);天津市应用基础与前沿技术研究计划项目(No. 14JCYBJC21700);天津市科技兴海项目 (No. KJXH2013-15)
摘    要:对于围海造陆工程所开展的超载预压处理方法,地基处理效果通常采用后续变形大小来评价,其大小与超载比和卸载控制时间密切相关。针对天津滨海地区围海造陆工程所形成的典型的上软、下硬的双层软黏土地基,采用改装的固结仪进行了多种超载比和卸载控制时间的试验研究,提出了适宜的超载比和最佳超载作用时间。试验表明:双层软黏土地基超载比大于0.375,超载作用时间超过主固结时间时,超载卸除后地基变形以回弹变形为主,后续的工后沉降将明显减小,减小幅度可高达70%以上;超载卸除后的土体次固结系数明显减小,减小的幅度随超载比的增大、超载作用时间的增加而减小;不同于均质地基和上硬下软的双层地基,上软、下硬双层地基的工后沉降以上部软土层沉降为主,约占总沉降量的73%以上。根据不同超载比和超载作用时间下土体的变形时程曲线,建议适宜天津滨海地区围海造陆工程软黏土地基的超载比控制在0.5以下,超载作用时间控制在1~3倍的主固结时间内。

关 键 词:双层软黏土地基  超载预压  超载比  超载作用时间  主固结时间  
收稿时间:2016-01-13

Experimental study of overload ratio and unloading control of double-layer soft clay foundation in a dredger fill site
LEI Hua-yang,REN Qian,LU Hai-bin,LI Bin.Experimental study of overload ratio and unloading control of double-layer soft clay foundation in a dredger fill site[J].Rock and Soil Mechanics,2016,37(11):3072-3078.
Authors:LEI Hua-yang  REN Qian  LU Hai-bin  LI Bin
Affiliation:1. Department of Architectural Engineering, Tianjin University, Tianjin 300072, China; 2. Key Laboratory of Coast Civil Structure Safety of Ministry of Education, Tianjin University, Tianjin 300072, China
Abstract:For surcharge preloading method used in land reclamation, the effect of ground treatment is usually evaluated by subsequent deformation, which depends largely upon the overload ratio and unload controlling time. This research focuses on the double-layer soft clay foundation with the upper soft layer and lower hard layer in coastal area in Tianjin. The appropriate overload ratio and the best time of overload are determined by consolidation experiment used a modified oedometer under various overload ratios and unload controlling times. The results show that when overload ratio is larger than 0.375 and overload time is longer than the primary consolidation time, the foundation deformation is mainly resilient deformation after overload removed. At the same time, the post-construction settlement decreases significantly by up to 70 percent. Secondary consolidation coefficient significantly reduces after removing the overload, and the longer the overload time and the overload ratio are, the smaller secondary consolidation coefficient is. Unlike the homogeneous foundation and the upper hard and lower soft double-layer foundation, the post-construction settlement of upper soft and lower hard double-layer foundation mainly comes from the upper soft soil layer, accounting for more than 73% of the total settlement. According to deformation curves under different overload ratios and overload times, it is suggested that the suitable surcharge ratio is 0.5 or less and the best overload time is controlled within 1 to 3 times the primary consolidation time for the layer soft clay foundation by land reclamation in coastal area in Tianjin,
Keywords:double layer soft clay foundation  surcharge preloading  overload ratio  overload time  primary consolidation time  
本文献已被 CNKI 等数据库收录!
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号