首页 | 官方网站   微博 | 高级检索  
     

大体积混凝土筏板基础冬季施工的质量控制
引用本文:刘福浩. 大体积混凝土筏板基础冬季施工的质量控制[J]. 山西建筑, 2007, 33(25): 247-248
作者姓名:刘福浩
作者单位:中铁二十二局集团第六工程有限公司,黑龙江牡丹江 157011
摘    要:结合大体积混凝土的施工实例,阐述了大体积混凝土冬季施工控制要点,详细介绍了牡丹江报业大厦工程筏板基础冬季施工时,采用暖棚法及分层、分段浇筑等的施工方案,保证了工程质量,取得了良好的效果。

关 键 词:大体积混凝土  裂缝控制  温度  冬季施工
文章编号:1009-6825(2007)25-0247-02
修稿时间:2007-03-26

Construction quality control mass concrete raft foundation in winter
LIU Fu-hao. Construction quality control mass concrete raft foundation in winter[J]. Shanxi Architecture, 2007, 33(25): 247-248
Authors:LIU Fu-hao
Abstract:Combined with practical construction work of mass concrete the key points for construction control of mass concrete in winter are elaborated.The winter construction technology of raft foundation work of newspaper buildings in Mudanjiang is introduced in detail,which adopt greenhouse method as well as segmentation pouring and other construction schemes and ensure engineering quality with good effect.
Keywords:mass concrete  crack control  temperature  winter construction
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号