首页 | 官方网站   微博 | 高级检索  
     

消纳风电预测偏差功率的电采暖负荷群运行调度策略
引用本文:严干贵,赵阳,杨玉龙,赵磊洋,阚天洋,杨森林,卢晓东.消纳风电预测偏差功率的电采暖负荷群运行调度策略[J].电力自动化设备,2022,42(7).
作者姓名:严干贵  赵阳  杨玉龙  赵磊洋  阚天洋  杨森林  卢晓东
作者单位:东北电力大学 现代电力系统仿真控制与绿色电能新技术教育部重点实验室,吉林 吉林 132012;国网辽宁营销服务中心,辽宁 沈阳 110000;国网冀北电力有限公司 承德供电公司,河北 承德 067000;国网青海省电力公司,青海 西宁 810008
基金项目:国家重点研发计划资助项目(2017YFB0902200);国家自然科学基金资助项目(51907020);国家电网有限公司2021年总部科技项目(5500-202199270A-0-0-00)
摘    要:构建以新能源为主体的新型电力系统将面临尖锐的调节资源供需矛盾,电采暖负荷具有可时移特性,是优质的存量可调节资源。拟挖掘电采暖负荷调节功率作为电网辅助备用,针对风电功率预测偏差消纳问题,设计了负荷聚合商响应风电预测偏差功率的调度架构,构建了电采暖负荷群响应风电预测偏差功率的轮流调控响应策略以最大化消纳偏差功率,设计了电采暖负荷群-风电场算例系统,基于此对所提出的电采暖负荷群响应风电预测偏差调控方法的有效性进行了仿真验证,并分析了负荷群参与响应后的经济性。

关 键 词:风电  电采暖负荷  备用能力  优化调度策略  风电消纳

Operation scheduling strategy of electric heating load group for wind power forecast deviation absorption
YAN Gangui,ZHAO Yang,YANG Yulong,ZHAO Leiyang,KAN Tianyang,YANG Senlin,LU Xiaodong.Operation scheduling strategy of electric heating load group for wind power forecast deviation absorption[J].Electric Power Automation Equipment,2022,42(7).
Authors:YAN Gangui  ZHAO Yang  YANG Yulong  ZHAO Leiyang  KAN Tianyang  YANG Senlin  LU Xiaodong
Affiliation:Key Laboratory of Modern Power System Simulation and Control & Renewable Energy Technology, Ministry of Education, Northeast Electric Power University, Jilin 132012, China;State Grid Liaoning Marketing Service Center, Shenyang 110000, China;Chengde Power Supply Company, State Grid Jibei Electric Power Company Limited, Chengde 067000, China;State Grid Qinghai Electric Power Company, Xining 810008, China
Abstract:The construction of a new power system with new energy as the main body will face a sharp contradiction between the supply and demand of adjustable resources. The electric heating load has time-shifting characteristics, and it is the high-quality adjustable resource in stock. It is intended that the electric heating load regulation power serves as the grid auxiliary reserve, aiming at the problem of wind power forecast deviation absorption, the scheduling framework of load aggregator responding to wind power forecast deviation is designed, and the alternate regulation response strategy of electric heating load group is cons-tructed to maximize the absorption of wind power forecast deviation. The example system of electric heating load group and wind farm is designed, based on which the effectiveness of the proposed regulation method for electric heating load group responding to wind power forecast deviation is verified by simulation, and the economy of the load group after taking part in response is analyzed.
Keywords:wind power  electric heating load  reserve capacity  optimal scheduling strategy  wind power absorption
点击此处可从《电力自动化设备》浏览原始摘要信息
点击此处可从《电力自动化设备》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号